Laserfiche WebLink
of the public drinking water supply systems or sewer systems <br />listed'in #4.a.i above or documentation that it is not <br />economically feasible to obtain service from them. <br />copies of written responses from each system or evidence that <br />they did not reply. <br /> <br />were <br />i, <br />ii. <br /> <br />your requests for service denied? <br /> If yes, continue. <br /> If no, please provide a detailed analysis which justifies your <br /> reasons for not accepting service. A separate analysis must be <br /> prepared and submitted for each system that granted your <br /> request for service. <br /> <br />Please summarize how the proposed utility system will be constructed <br />and describe each projected construction phase, if any: <br /> N/A <br /> <br />Date of plat approval, if required: N/A <br />Approved by: <br /> <br />E. Date Plans & Specifications submitted for approval N/A <br /> Log No. <br /> Attach copy of approval letter if available. <br /> <br />F. Date construction is scheduled to commence N/A <br /> <br />G. Date service is scheduled to commence N/A <br /> <br />EXISTING SYSTEM INFO~I~kTION <br />1. Please provide the following information for each water and/or sewer <br /> system: <br /> i. water system's TNRCC Public Water System identification number: <br /> <br />ii. Sewer system's TNRCG Discharge Permit number: (for each system) <br /> <br />iii. Date of last inspe~ion .... <br />iv. Attach a copy of the most recent inspection report letter. <br />v. For each system deficiency listed in the inspection report <br /> letter, attach a brief explanation listing the actions taken or <br /> being taken by the utility to correct the listed deficiencies, <br /> including the proposed completion dates. <br />SEE EXHIBIT B <br />using the current number of customers, is any facility component in <br />systems named in #5A above operating at 85% or greater of minimum <br />standard capacity? <br /> Yes No x <br />Attach an explanation listing the actions to be taken to make system <br />improvements including proposed completion dates (see 291.93(3)(A) <br /> <br /> <br />