Laserfiche WebLink
<br />ILf%B <br /> <br /> <br />NATIONAL <br />ENVIRONMENTAL <br /><2> TESTING, INC. <br /> <br />Au3:in Oivision <br />2621 Aldgepoint C>ive <br />Suite 130 <br />Austin. TX 78754 <br /> <br />Tel: (512) 928-8905 <br />Fax: (5 12) 928.3208 <br /> <br />March 21, 1994 <br /> <br />Ms. Frances Plocek <br />Industrial Pretreatment Supervisor <br />city of San Marcos <br />,. 'East Hopkins <br />l 1 Marcos, Texas 78666 <br /> <br />The followin~ bid for composite sampling services is being submitted <br />~or your rev~ew. <br /> <br />Based on the information presented in the bid specifications, sampling <br />charges are given based on the three sampling time periods needed. <br /> <br />~. 24 hour operations: Equipment rental $50 <br /> Personnel costs $25 <br /> Total Sampling Costs $75 per site <br />Based on estimated nwnber of sites (57) : <br /> Total Sampling Costs = $4,220 <br /> ~ <br /> <br />2. Sam - 5pm hour operations: <br /> <br />Equipment rental $50 <br />Personnel costs $125 <br /> <br />Total Sampling Costs <br /> <br />Based on estimated nwnber of sites (57): <br />Total Sampling Costs ~ $9,840 <br /> <br />$175 per site <br /> <br />3. <br /> <br />llam - lam operations: <br /> <br />Equipment rental <br />Personnel costs <br /> <br />$50 <br />$25 <br /> <br />~per site <br /> <br />Total Sampling Costs <br /> <br />Based on 'estimated number of sites(l14): <br />Total Sampling Costs = $8,440 <br /> <br />Tota1 sampling costs for the estimated 225 sites - $22,500 <br /> <br />The breakdown of costs based on the hours of operation, reflects the <br />differing amounts of personnel time ~equired for sampling. <br /> <br />(I) <br />