Laserfiche WebLink
<br /> í/o;V <br /> -15- <br /> 13.1 BASIC COMPENSATION <br /> 13.1.1 For Tasks 1 and 2 of Basic Services 1 as described in <br /> Sections 1.1 and 1.2, the ENGINEER will be compensated in fixed <br /> fee amounts as follows: <br /> TASK 1- SITE SURVEY <br /> Survey Crew: Data Collection $ 4/080.00 <br /> ---- Level Control 340.00 <br /> Critical Spot Check 1/020.00 <br /> Technical Services- Verification 1/560.00 <br /> and Plotting <br /> Professional Services- Supervision & <br /> check 640.00 <br /> Total TASK 1: $ 7/640.00 <br /> TASK 2- PRELIMINARY DESIGN $12,450.00 <br /> 13.1. 2. The total basic fee to be paid to ENGINEER for Task 3 <br /> services 1 including subcontractor consultants 1 but not including <br /> reimbursable expenses, will be 90% of the amount determined by <br /> applying the percentage shown on Curve A on the attached Curves of <br /> Compensation for the awarded contract amount for each respective <br /> construction phase to the awarded contract amount, less a prorata <br /> share of the Basic Compensation for the Preliminary Design, Task <br /> 21 for such respective construction phase. In no event 1 however 1 <br /> will the total of all fees for Task 3 services exceed $26,415.00 <br /> without the approval of the City Council of the CITY. An increase <br /> in these fees may be necessary if the scope of the Project is <br /> substantially changed. <br /> 13.1.3. The total basic fee to be paid to ENGINEER for Task 4 <br /> services 1 including subcontractor consultants, but not including <br /> reimbursable expenses 1 will be 10% of the amount determined by <br /> applying the percentage shown on Curve A on the attached Curves' of <br /> Compensation for the awarded contract amount for each respective <br /> construction phase to the awarded contract amount. In no event, <br /> however 1 will the total of all fees for Task 4 services exceed <br /> $4,180.00 without the approval of the City Council of. the CITY. <br /> An increase in these fees may be necessary if the scope of the <br /> Project is substantially changed. <br /> 13.1.4 The total of all reimbursable expenses under. this <br /> Agreement will not exceed $1,500.00. <br />