My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1994-134
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1994
>
Res 1994-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2007 11:47:30 AM
Creation date
6/29/2007 11:47:30 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1994-134
Date
8/22/1994
Volume Book
116
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> í/o;V <br /> -15- <br /> 13.1 BASIC COMPENSATION <br /> 13.1.1 For Tasks 1 and 2 of Basic Services 1 as described in <br /> Sections 1.1 and 1.2, the ENGINEER will be compensated in fixed <br /> fee amounts as follows: <br /> TASK 1- SITE SURVEY <br /> Survey Crew: Data Collection $ 4/080.00 <br /> ---- Level Control 340.00 <br /> Critical Spot Check 1/020.00 <br /> Technical Services- Verification 1/560.00 <br /> and Plotting <br /> Professional Services- Supervision & <br /> check 640.00 <br /> Total TASK 1: $ 7/640.00 <br /> TASK 2- PRELIMINARY DESIGN $12,450.00 <br /> 13.1. 2. The total basic fee to be paid to ENGINEER for Task 3 <br /> services 1 including subcontractor consultants 1 but not including <br /> reimbursable expenses, will be 90% of the amount determined by <br /> applying the percentage shown on Curve A on the attached Curves of <br /> Compensation for the awarded contract amount for each respective <br /> construction phase to the awarded contract amount, less a prorata <br /> share of the Basic Compensation for the Preliminary Design, Task <br /> 21 for such respective construction phase. In no event 1 however 1 <br /> will the total of all fees for Task 3 services exceed $26,415.00 <br /> without the approval of the City Council of the CITY. An increase <br /> in these fees may be necessary if the scope of the Project is <br /> substantially changed. <br /> 13.1.3. The total basic fee to be paid to ENGINEER for Task 4 <br /> services 1 including subcontractor consultants, but not including <br /> reimbursable expenses 1 will be 10% of the amount determined by <br /> applying the percentage shown on Curve A on the attached Curves' of <br /> Compensation for the awarded contract amount for each respective <br /> construction phase to the awarded contract amount. In no event, <br /> however 1 will the total of all fees for Task 4 services exceed <br /> $4,180.00 without the approval of the City Council of. the CITY. <br /> An increase in these fees may be necessary if the scope of the <br /> Project is substantially changed. <br /> 13.1.4 The total of all reimbursable expenses under. this <br /> Agreement will not exceed $1,500.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.