Laserfiche WebLink
<br /> [tôE <br /> -6- <br /> unsafe, ENGINEER will immediately inform the CITY and will take <br /> all necessary action which the ENGINEER is authorized under this <br /> Agreement to take to correct the matter. In such situations, the <br /> ENGINEER will have the right and power, with the concurrence of <br /> the CITY, to immediately cease the work by Contractor on the <br /> Project. <br /> 1.4.6 At all times have access to the work wherever it is in <br /> preparation or progress. <br /> .- 1. 4.7 Determine the amounts owing to the Contractor based on <br /> its on-site professional inspections and on evaluations of the <br /> Contractor's applications for payment including comparisons of <br /> Contractor's monthly cost reports with its applications for <br /> payment, and will make recommendations for payment in these <br /> amounts, as provided in the construction contract documents, or <br /> take such other appropriate action which the ENGINEER deems <br /> necessary. <br /> .- . <br /> 1.4.8 Make recommendations for payment that constitute a <br /> representation by ENGINEER to the CITY, based on the ENGINEER's <br /> on-site observations as provided in Subsection 1.4.4 and on the <br /> data comprising the Contractor's application for payment, that the <br /> work has progressed to the point indicated; that, to the best of <br /> the ENGINEER's knowledge, information and belief, the quality of <br /> the work is in acceptable conformance with .the construction <br /> contract documents (subject to an evaluation of the work for <br /> conformance with the construction contract documents upon <br /> substantial completion, subject to the results of any subsequent <br /> tests required by or performed under the construction contract <br /> documents, subject to minor variations from the construction <br /> contract documents correctable prior to completion, and subj ect. to <br /> any specific qualifications stated in the Certificate for <br /> Payment); and that the Contractor is entitled to payment in the <br /> amount certified. However, the issuance of a Certificate for <br /> Payment will not be a representation that the ENGINEER has made <br /> any examination to ascertain how and for what purpose the <br /> Contractor has used the monies paid by the CITY. <br /> 1.4.9 Have authority to reject work which does not conform to <br /> the construction contract documents. Whenever, in the ENGINEER's <br /> reasonable opinion, it is necessary or advisable for the proper <br /> implementation of the intent of the construction contract <br /> documents, and with the approval of the CITY, the ENGINEER will <br /> have authority to require special inspection or testing of the <br /> work in accordance with the provisions of the construction <br /> contract documents, whether or not such work is then fabricated, <br /> installed or completed. The ENGINEER will monitor and review the <br /> work and results of all testing laboratories as required by the <br /> construction contract documents. <br /> 1. 4.10 Review and make all decisions regarding the approval or <br /> taking of other appropriate action upon the Contractor's <br /> submittals, including but not limited to, shop drawings, product <br />