Laserfiche WebLink
<br /> ¡OlE <br /> TRANSPORT A TION ENHANCEMENT PROGRAM NOMINATION <br /> Page 3 of 10 FORM <br /> 5. NOMIN A TING ENTITY. <br /> A. NAME City of San Marcos <br /> <br /> B. ADDRESS 630 E. Hopkins Street <br /> <br /> C. CITY San Marcos, Texas <br /> <br /> D. ZIP CODE 78666 <br /> E. CONTACT PERSON Rodney Cobb. Director, Parks and Recreation Department <br /> <br /> F. TELEPHONE 512- 754-7275 G. FAX No 512-353-7273 <br /> 6. PROJECT LOCATION. <br /> A. CITY/COUNTY San Marcos/Havs County B. TxDOT DISTRltT(S) Austin <br /> <br /> C. ROUTE NUMBER/STREET NAME/FACILITY NAME <br /> <br /> D. PROJECT LIMITS Restoration and completion of connective trail and pedestrian <br /> network. and interpretive center. Trails will connect multiple river parkland areas, including the Little <br /> League Fields with: Three low-middle income neighborhoods, the library and newly funded activity <br /> center. It will abut established and proposed hike/bike trails included in SWTSU's long rangeplan, planned <br /> connective trails to major grocery and shopping areas and low income and elderly housing. It will include <br /> sidewalk beautification and bike lanes between the downtown area, the San Marcos River trails and the <br /> campus of SWTSU. <br /> E. PROJECT LENGTH In length the project encompasses the entire river corridor from <br /> University Drive to IH35. Its width is from Bobcat Drive to Guadalupe Str~et. <br /> < <br /> 7. ESTIMATION OF FUNDS REQUIRED. Following selection by the Texas Transportation <br /> Commission and approval by FHW A, all projects will be funded on a cost-reimbursable basis. Costs <br /> incurred before this time are not allowable. Be as accurate as possible. An inaccurate estimate may result in <br /> an unexpected increase In the amount of funding required for the local match. <br /> Year Funds Local Match Total Project <br /> Required Cost - <br /> <br /> 12-24 months $1.608,000 $402.000. $2.010.000. <br /> <br /> - 3 <br />