Laserfiche WebLink
<br /> ~ f9}11J <br /> OPERATIONAL PLAN <br /> - <br /> . <br /> STEP SITE DESCRIPTION START OF END OF <br /> SITE (INCLUDE APPROXJMATE LENGTH IN J\1ILES SHIFT SHIFT <br /> NUMBER AND POSTED SPEED) (DA YfTIME) (DAYfI1tvÅ’) <br />.. 25 POSTED SPEED LThtlIT: 30 ìvIPH ** ** <br />- <br /> W. San Antonio Street (from W. Hopkins Street to Guadalupe Street) <br /> Approximately 1.3 miles <br /> . . <br />: <br /> 26 POSTED SPEED LllvfIT: 20 MPH (SCHOOL ZONE) ** ** <br /> Post Road (from Railroad Crossing south of Bert Brown Street to approx. <br /> 200 feet south of Uhland Road) <br /> Approximately .4 miles <br />" <br /> 27 POSTED SPEED LIMIT: 30 MPH (SCHOOL lONE) ** ** <br /> State H'\'ty 123 (from Ebony Street to City Limits) <br /> Approximately. 7 miles <br /> " <br /> <br /> , . <br /> " , <br /> ,': ',- <br /> , <br /> .. . 1# <br /> " <br />,I <br /> - <br /> <br /> NOTE: Subgrantee may work additional STEP enforcement hour3 on holidays or special events if these times are not covered <br /> under shifts identified above. These additional hours must be described in the Project Performance Report. <br /> ** Officers will work a four hour shift at the above STEP sites between the hours of7:00 am to 10:00 pm from Sunday through Saturday <br /> depending upon the weather, daylight savings time, and school hours. If an officer makes a STEP-related arrest during the shift, but does <br /> not complete the arrest before the shift is scheduled to end, the officer can continue working under the grant to complete that arrest. <br /> Page 4 of 4 <br />