My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01.15.13 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2013
>
01.15.13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 4:24:50 PM
Creation date
1/16/2013 2:33:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
1/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OWNER CITY OF SAN MARCOS, TEXAS <br />PROJECT Comanche 24" WTM <br />CONTRACTOR Santa Clara Construction <br />ARCHITECT KBR Technical Services, Inc. <br />REFERENCE DATA: <br />SPECIFICATION SECTION NO. <br />SHEET NO. 38 ENTITLED <br />DETAIL DESIGNATION <br />PAGE NO. <br />iT FOR INFORMATION (RI <br />PROJECT NO. <br />OWNER <br />CONTRACTOR <br />ARCHITECT <br />RFI NO. 12 (Twelve) <br />PARA. NO. <br />24" WTM / 8" Existing AC WL Conflict at Forest and Buena Vista <br />DRAWING ATTACHED (YES/NO) <br />❑ INFORMATION, ❑ INTERPRETATION, ® CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED BELOW OR IN ATTACHED MATERIALS REFERENCED BELOW <br />The existing 8" AC Waterline actual location is in conflict with the proposed 24" WL in the Forest and Buena <br />Vista intersection starting at approximately Sta 23 +88.82. The existing 8" is further North in the easement than <br />is indicated and the lead to the existing FH would be in conflict with the 45 degree bend. The proposed solution <br />is to move the proposed 24" WL to the Southern edge of the easement which would avoid this conflict as well <br />as avoid the existing power pole at Sta 22 +44.71. The 24" WL would return to the proposed assignment at <br />22 +34.14. See attached pdf. <br />REQUESTED BY: Tim Unger DATE: 10/10/12 <br />❑ INFORMATION, ❑ INTERPRETATION, ❑ CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED ABOVE OR IN ATTACHED MATERIALS REFERENCED ABOVE <br />Please proceed with suggested field change as illustrated in attached sketch and with attention to Utility Note <br />#7 on Sheet 3 of project plans <br />RESPONSE BY: Ramon Salazar, P.E. DATE: 10/11/12 <br />Y: \Water Resources \SNM ATW2 COMANCHE \Construction\RFls\RFiNo. 12.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.