My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01.15.13 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2013
>
01.15.13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 4:24:50 PM
Creation date
1/16/2013 2:33:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
1/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FUK INFUKMA I IUN <br />OWNER CITY OF SAN MARCOS, TEXAS I PROJECT NO. <br />PROJECT Comanche 24" WTM <br />CONTRACTOR Santa Clara Construction <br />ARCHITECT KBR Technical Services, Inc. <br />REFERENCE DATA: <br />SPECIFICATION SECTION NO. <br />SHEET NO. 46, 47, and 48 ENTITLED <br />DETAIL DESIGNATION <br />PAGE NO. <br />OWNER <br />CONTRACTOR <br />ARCHITECT <br />RFI NO. 16 (Sixteen) <br />PARA. NO. <br />Existing 12" Waterline Conflict Sta 55 +50 to 66 +10 <br />DRAWING ATTACHED (YES /NO) <br />❑ INFORMATION, ❑ INTERPRETATION, ® CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED BELOW OR IN ATTACHED MATERIALS REFERENCED BELOW <br />In potholing the 12" waterline from Sta 56 +30 to 66 +10 it was discovered to be in conflict with the proposed <br />24" waterline and not as indicated on the plans. It's assignment varies from 2' to the NW to 2' to the SE of the <br />proposed 24" waterline and in most places is either right on top of it or 1' off. Attached is an option that would <br />shift the assignment of the 24" waterline 8' to the NW. In order to do this 2 -11.25 degree bends would need to <br />be utilized at approx. Sta 55 +90 and 56 +20. 1 am assuming 801f of restrained pipe (40' on either side of the <br />bends), however it will need to be approved. Pricing is attached as well. <br />REQUESTED BY: Tim Unger DATE: 10/31/12 <br />❑ INFORMATION, ❑ INTERPRETATION, ❑ CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED ABOVE OR IN ATTACHED MATERIALS REFERENCED ABOVE <br />The recommended alignment shift is approved. The work will be paid for as over -runs for now. A change order <br />will be generated at the end of the project to capture all over - runs /under -runs. 40' of restrained pipe on either <br />side of the bend is sufficient. <br />Ar <br />RESPONSE BY: DATE: 11101/2012 <br />C\Documents and Settings\hbd7108\Local Settings\Temporary Internet Files \OLK41RFI#016 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.