My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01.15.13 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2013
>
01.15.13 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 4:24:50 PM
Creation date
1/16/2013 2:33:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
1/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR INFORMATION <br />OWNER CITY OF SAN MARCOS, TEXAS I PROJECT NO. <br />PROJECT Comanche 24" WTM <br />CONTRACTOR Santa Clara Construction <br />ARCHITECT KBR Technical Services, Inc. <br />OWNER <br />CONTRACTOR <br />ARCHITECT <br />RFI NO. <br />19 (Nineteen) <br />REFERENCE DATA: <br />SPECIFICATION SECTION NO. PAGE NO. PARA. NO. <br />SHEET NO. Sheet 33 ENTITLED Ed J.L. Green Street Repair <br />DETAIL DESIGNATION DRAWING ATTACHED (YES /NO) <br />❑ INFORMATION, ❑ INTERPRETATION, M CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED BELOW OR IN ATTACHED MATERIALS REFERENCED BELOW <br />At the 24" x 24" tie in located on Ed J.L. Green at Sta 0 +77.28, there is no detail or direction as to the <br />utility trench /street repair. Please advise. <br />REQUESTED BY: Tim Unger DATE: 11/29/12 <br />❑ INFORMATION, ❑ INTERPRETATION, ❑ CLARIFICATION IS REQUESTED FOR THE ITEMS <br />DESCRIBED ABOVE OR IN ATTACHED MATERIALS REFERENCED ABOVE <br />The contractor shall repair the road per the street trench detail titled Asphalt <br />Pavement with Type "A" HMAC backfill shown on sheet 56. The contractor <br />shall use Type D instead of Type C on the final 2" of HMAC. Payment will <br />be made the Ton for the Type A HMAC backfill and by the SY for the TY D <br />using the existing bid items. A change order will be generated at the end of <br />the project to capture the over -runs of approximately 28 SY of TY D and 55 <br />Tons of Type A. <br />pgxairy sgrea ey Shun com« <br />RESPONSE BY: Ca�lz R�ougk� rc DATE: <br />T:\ActivePrj \Comanche 24 Transmission Main\ 6 - Construction \RFI\Draft \RFI #019.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.