My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1993-006
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1993
>
Res 1993-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2007 2:03:41 PM
Creation date
7/2/2007 2:03:41 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1993-6
Date
1/11/1993
Volume Book
109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,M~-~IDEPARTMENT OF TRANSPORTATION <br /><M 112A (ROSCOE 7-92) <br /> <br />(ATTACHMENT A) <br /> <br />APPROVAL OF CHANGE IN PLANS <br /> <br />:. Req. No. 4 Accomp. by Sketches or F.C. Plan-Sheets Numbered N/A Hwy. No. LP 82 <br />iass County, Federal P?j. No. NH 92(10)M Control 0016-09-025 <br />THE EXECUTIVE DIRECTOR: <br /> Approval of the following changes in plans and/or specifications is requested. <br /> Limits: Sta. 1508 + 25.51 to Sta. 11568 + 81 <br /> Description: Add 5 double light pole standards in the ROW along the playing fields of <br /> Southwest Texas State University. At the intersection of LP 82 and Post Rbad changing <br /> the installation of traffic signals by increasing the loop spacing, adding 1/4" cable <br /> inwire, and adding one signal head 5-section horizontal w/12" lens. <br /> <br />',~s field change is requested for the following reasons: See attached letteF~'~'' <br /> <br />m No. Description <br />0-004 Rdwy Ill Assem <br /> (Ty ST 50S-8) (.4kw)s <br />0-006 Rdwy Ill Assem <br /> (Ty ST 50S-8-8) (.4kw)s <br />2-002 Installation of Hw¥ <br /> <br />Supported by Supplemental Agreement No. 3 <br />Contractor: Hunter Industries, Inc. <br /> Field Chanqe Quantities <br /> <br /> Contract <br /> Unitt Ouantit¥ Price <br /> Ea I 18.00 1000.00 <br /> <br />Traf Sianal (sD1) <br /> <br />Ea t 5.00 <br /> <br />Ls I t.00 <br /> <br />1977.25 <br /> <br />5148.63 <br /> <br />and by Extra Work Order No. <br /> <br />Amount <br /> <br />18000.O0 <br /> <br />9886.25 <br /> <br />5148.63 <br /> <br />Original Plan Quantities <br /> <br />Quantity <br /> 23.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />Contract <br />Price <br /> <br />1000.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />Amount <br /> <br />23000.00 <br /> <br />O.OU <br /> <br />0.00 <br /> <br />ity of San Marcos responsible for increase cost to item 610-006 over 610-004 'S 4,886.25) <br />us 7% Construction Engineering. <br />Added by Supplemental Agreement <br /> <br />dnl Days 0 Time Ext No 0 Total $ <br /> <br />33,034.88 Total ...... S <br /> <br />23,000.00 <br /> <br />aled Copy on File <br /> <br />Net UnderrunS <br /> <br />Net Overruns <br /> <br />10~034.88 <br /> <br />PECiYULLY REQUESTED BY: <br />a/ProjeclE?~neer Date <br /> <br />bettor of Construction/ Date <br />erations <br /> <br />APPR~fVED- BY: <br /> <br />District Engineer <br /> <br />Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.