Laserfiche WebLink
U S SPRINT <br /> ESTIMATED COST SUMMARY <br />SAN MARCOS, TEXAS <br />PROPOSED WORK ORDER NO.: <br /> <br />CONTRACT SERVICES/DIRECT CHARGES <br /> <br />CONTRACT CONSTRUCTION LABOR AND EOUIPNENT <br />CONTRACT CONSTRUCTION MATERIAL <br />RAILROAD FLAGGING <br /> <br />TOTAL CONTRACT SERVICES/DIRECT CHARGES <br /> <br />i~.8~.60 <br /> ~049,05 <br /> 2,600.00 <br /> <br />19~532,65 <br /> <br />US SPRINT LABOR <br /> <br />NETWORK ENGINEERING LABOR <br /> <br /> NETWORK TECHNICIAL ENG IV <br /> DRAFTER <br /> TECHNICIAN <br /> INSPECTOR <br /> <br />TOTAL ESTIMATED LABOR <br /> <br />OVERHEAD <br /> <br />VERSION: 890790.A4 <br /> <br />LABOR OVERHEAD <br /> <br /> NETWORK ENGINEERING LABOR <br /> <br />GENERAL & ADMINISTRATIVE OVERHEAD <br /> G & A BASE <br /> <br /> US SPRINT LABOR AND LABOR OVERHEAD <br /> CONTRACT SERVICES <br /> <br />MATERIAL PROVIDED BY US SPRINT <br />PROJECT SUNDRIES <br />FREIGHT AND TAXES <br />TOTAL ESTIMATED G & A BASE <br /> <br /> GENERAL ~ ADMINISTRATIVE OVERHEAD RATE <br /> <br />COST CENTER <br /> <br /> 554820 <br /> 554820 <br /> 554820 <br /> 554820 <br /> <br /> ESTIMATED <br /> MEDIAN <br />HOURS LABOR RATE ESTIMATE <br /> <br /> 20 28,75 '' 575.00 <br /> 4 15.16 60.64 <br /> 40 10~84 43~.60 <br /> 40 28,75 1,150.00 <br /> <br />104 2,2~Q 94 <br /> <br /> LABOR TOTAL ESTIMATED <br />RATE LABOR $ OVERHEAD LABOR & O/H <br /> <br /> 248,80% 2,2!9,24 5,521.47 7.740.7I <br /> - ~lo ~ 5.52!.47 7.740,71 <br /> <br />ESTIMATED COST <br /> <br /> 7,740,7! <br /> <br />19,532.65 <br /> <br /> 0.00 <br /> <br />0.00 <br /> <br />16,000~ <br /> <br /> 0.00 <br />4~363,74 <br /> <br />TOTAL ESTIMATED COST OF PROJECT TO BE REIMBURSED <br /> <br />NOTE: THE OVERHEAD RATES APPLIED ARE BASED Oil THE OVERHEAD <br />METHODOLOGY DEVELOPED BY US SPRINT'S GOVERNMENT SYSTEMS DIVISION. <br /> <br />$31~637.10 <br /> <br /> <br />