Laserfiche WebLink
<br /> / 3'1 H <br /> DA TE: April 22, 1993 Item No.2 <br /> PROJECT: Reconstruction and Realignment of Airport Access Road <br /> San Marcos Municipal Airport <br /> San Marcos, Texas <br /> PREPARED BY: Michael Lynn Moore, P.E. <br /> Item <br /> No. Description Quantity Unit Cost Amount <br /> 1 H.M.AC. 1,829 TON $45.00 $82,305 <br /> 2 Aggregate Base 2,841 C.Y. 25.00 71,025 <br /> 3 Prime Coat 5,966 GAL 1.50 8,949 <br /> 4 Lime Treated Subgrade 20,470 S.Y. 2.00 40,940 <br /> 5 Lime 277 TON 90.00 24,930 <br /> 6 Unclassified Excavation 5,680 C.Y. 5.00 $28,400 <br /> 7 Drainage 1 LS. 53,250 53,250 <br /> SUBTOTAL $309,799 <br /> Contingencies 30,979 <br /> TOTAL CONSTRUCTION COST .. <br /> $340,778 <br /> Property Acquisition 169,500 <br /> Engineering 20,446 <br /> Testing, Survey, Misc. 24,831 <br /> TOTAL ESTIMA TE $555,555 <br />