Laserfiche WebLink
<br /> /10 <br /> tP- <br /> Page No. 6 CITY OF SAN MARCOS <br /> 06/17/93 TRANSITION PLAN <br /> O8J TYPE PRIOR FACILITY CATEGORY PROBLEM COST RfMEDY INTERNAl <br /> ESTIMATE WORK <br /> 3 A 1 RH toilet stalls alternate stall 0 addressed with restroom modif N <br /> 3 A 1 RH toilet stalls door width 0 addressed with restroom modif N <br /> 3 8 2 RH toilet stalls grab bar height/width 0 addressed with restroom modif N <br /> 3 A 1 RH toilet stalls stall depth 0 addressed with restroom modif N <br /> 3 A 1 RH toilet stalls toe clearance 0 addressed with restroom modif N <br /> 3 A 2 RH urinals rim height 0 addressed with restroom modif N <br /> 3 8 2 RH water closets seat height 0 addressed with restroom modif N <br /> Total 40825 <br /> 1 A 2 RV curb ramps least slope used 0 addressed with ramp rebuild N <br /> 1 A 2 RV curb ramps ramp slope 500 rebuild ramp by railroad N <br /> 2 A 1 RV fountains control unit location 650 replace fountain N <br /> 2 A 1 RV fountains spout location 0 replace fountain N <br /> 2 A 3 RV playground area accessible route 2100 sidewalk to area N <br /> 2 A 3 RV playground area observation area 900 concrete observ area N <br /> Total 4150 <br /> 1 A 3 VP ext routes good fixture surfaces 1000 relevel around fixtures N <br /> 1 A 3 VP ext routes good route surfaces 5500 relevel brick walkways N <br /> Total 6500 <br /> 2 A 2 WB controls etc service counter size 2000 lower section of counter N <br /> 1 A 2 W8 curb ramps least slope used 500 extend ~amp area in front N <br /> 1 A 1 W8 curb ramps ramp slope 1500 rebuild ramp N <br /> 2 A 1 W8 doors clear width 5000 replace 7 doors N <br /> 1 A 2 WB doors maneuvering space 750 rebuild front landing N <br /> 2 A 3 W8 doors maneuvering space 1000 reset 4 doors N <br /> 1 A 1 W8 ext route route to entrance 475 rebuild ramp at front door N <br /> 1 A 1 W8 ext routes good route surface 0 addressed with ramp rebuild N <br /> 1 B 1 we handrails handrails provided 500 add a handrail N <br /> 1 A 2 WB landings change in direction 500 install landing in middle N <br /> 3 A 2 W8 lavatories below-counter clearance 0 addressed with restroom modif N <br /> 3 B 2 WB lavatories faucet controls 0 addressed with restroom modif N <br /> 3 A 2 1018 lavatories knee & toe clearanca 0 addressed with restroom modif N <br /> 4 A 1 W8 meeting rooms accessible route 3000 move hallway wall N <br /> 3 A 1 W8 rest rooms access entrance door 1400 replace restroom doors N <br /> 3 A 1 we rest rooms controls clear flor space 0 addressed with restroom modif N <br /> 3 A 1 W8 rest rooms one accessible per floor 30000 make restrooms accessible N <br /> 3 A 2 WB rest rooms turning space 0 addressed with restroom modif N <br /> 1 8 1 W8 stairs continuous handrail 500 extend handrail N <br /> 2 8 3 we stairs rounded handrail ends 200 modify handrail N <br /> 3 A 1 W8 water closets clear floor space 0 addressed with restroom modif N <br /> 3 B 2 we water closets grab bar height/width 0 addressed with restroom modif N <br /> 3 B 2 W8 water closets seat height 0 addressed with restroom modif N <br /> Total 47325 <br /> Grand Total: 291725 <br />