My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1981-026
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1981
>
Res 1981-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2004 2:41:37 PM
Creation date
12/8/2003 10:21:40 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1981-26
Date
3/12/1981
Volume Book
55
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />¿ 2 <br />-' <br /> <br />C. <br /> <br />Description of ServicEs to be Performed by Proposed Subcontractor <br /> <br />Instructions: Provide a brief but precise dEscription of the services <br />or activities to be performed by the proposec subcontractor. The <br />explanation should be written for someone uniamiliar with the nature <br />of the \.¡or'k to be performed and should inc1uce: <br /> <br />1. Specific purpose of the subcontract: <br />Use the expertise of a management consultant to establish a goal- <br />based performance management system which can be integrated with <br />the budgetary process as well as the City master plan and achieve <br />an optimum level of productivity for the City. <br />2. Projected results of the subcontractor: <br />Work Simplification Program, Goal-based Performance Evaluation <br />System, Supervisory-management and other training required to <br />successfully implement the performance management system. <br /> <br />3. Method subcontractor will use to accomp1'sh the proj~cted results. <br />Review each component of the existing management process, recommend <br />and assist in implementation of desired additions, revisions or <br />changes; design Work Simplification and Performance Evaluation System <br />along with implementation steps; conduct training and periodically <br />Subcontractor I sPas t Performance evalua te progress <br /> <br />D. <br /> <br />1. <br /> <br />Have you ever been a prior receipient of subcontractor's services~ <br />yes xx no. <br /> <br />2. <br /> <br />If the answer to the above is ~, give ¡ brief history of the sub- <br />contractor's performance, including an a~sessment of subcontractor's <br />degree of proficiency in operating such !,rogram(s): <br /> <br />E. <br /> <br />Contractor Siqnature <br /> <br />I certify that the information contained wit\\in this form is true, accurate, <br />and complete. <br /> <br />4~ eAur.t~ <br /> <br />CONTRACTOR'S SIGNATURE <br />Management-Marketing Personnel <br />Chastain and Associates <br /> <br />March 17, 1981 <br />DATE <br /> <br />Consultant <br />
The URL can be used to link to this page
Your browser does not support the video tag.