Laserfiche WebLink
<br /> I S'IL <br /> f <br /> SAN MARCOS ELECTRIC UTILITY <br /> ELECTRIC RATE SCHEDULES <br /> LARGE GENERAL SERVICE-SECONDARY <br /> Rate Schedule - LGS-Sec <br /> Effective: June 1, 1993 Page 3 <br /> <br /> INTERRUPTION OF SERVICE <br /> The City will make reasonable provisions to insure satisfactory and continuous service, but <br /> does not guarantee a continuous supply of electric power and energy from the City System <br /> facilities and shall not be liable for damage occasioned by interruptions of service or failure to <br /> commence delivery caused by acts of God, or the public enemy, or for any cause reasonably <br /> beyond the control of the City, including, but not limited to, the failure or breakdown of <br /> facilities, floods, fire, strikes, or actions or orders of any agency having jurisdiction in the <br /> premises, or for interruptions which are necessary for inspection, repair, or changes in the <br /> equipment and facilities of the City, the City System or the bulk power supplier(s) to the City <br /> System. The Customer shall notify the City immediately of any defects, troubles or accident <br /> which may in any way affect the delivery of electric service by the City from the City System. <br /> . <br /> , <br />