<br />I~P <br /> <br />Each meter will be calibrated for accuracy prior to installation. After <br />the monitors have been checked and calibrated, they will be ready for <br />installation. Each instrument will be checked routinely to determine if <br />re-calibration is needed. <br /> <br />Prior to installation, each manhole will be inspected to determine if <br />any special problem might be encountered, i.e., surcharging, extreme <br />depths, debris, etc. Once this is ascertained, the installation will be <br />initiated by the field crew. The operation and maintenance wlll be <br />handled by a crew of two men. The typical checking cycle is once per <br />week. Each instrument will be inspected to confirm operation of the <br />meter. Routine maintenance and service will be performed. The depth <br />and velocity sensors will be inspected to ensure they are clean and free <br />of any debris. A formal log of each such check will be recorded and <br />filed. The manhole number (meter location), date, time on meter, and <br />the time of manual depth verification will be indicated on the log. <br />During this phase, a written record will be maintained for each <br />monitoring point for each site inspection. <br /> <br />A total of 12 flow meters will be installed for an 8 week monitoring <br />period. It is anticipated that an 8 week monitoring period will be <br />sufficient to collect data necessary for system analysis. It should be <br />noted however, that if sufficient rainfall does not occur during the 8 <br />week monitoring period, then additional monitoring will be recommended. <br />Costs associated with this additional flow monitoring may be handled as <br />supplemental services to this contract. ~ <br /> <br />2. Install and Service Rain Gauges. Continuous recording rainfall <br />gauges will be installed and operated during the flow monitoring period. <br />The rainfall gauges will be "tipping-bucket" rainfall gauges accurate to <br />0.01 inches. <br /> <br />A total of 3 rainfall gauges will be installed and operated. <br /> <br />D. Flow and Rainfall Data Analysis. <br /> <br />Comprehensive data analysis will be performed to evaluate system behavior and <br />develop model input parameters. <br /> <br />1. Determine Wastewater Production. Wastewater flow exclusive of <br />infiltration and inflow will be determined from population and land use <br />data and estimated wastewater production rates within each sewershed and <br />subsystem. <br /> <br />2. Determine Average Daily Dry Weather Flow. The 'normal. dry weather <br />low groundwater flow will be determined based on water meter data during <br />dry weather/low groundwater conditions. Wastewater production diurnal <br />peaking factors will be developed for each basin. <br /> <br />3. Determine Infiltration Flow. The infiltration flow (additional <br />flow during high groundwater/dry weather conditions) will be determined <br />for each subsystem. The infiltration will be expressed in units to <br />allow comparison between basins. <br /> <br />06/02/93 <br /> <br />A-9 <br />