Laserfiche WebLink
Item 15 <br />Attachment # 2 <br />Page 3 of 6 <br />"w�ww <br />R <br />Site Fees <br />Public Improvement Construction Plans (PICP) <br />Subdivision Improvements including more than 1 type of Infrastructure <br />$2,000 + $50/ acre (includes the entire limits <br />I of construction <br />Individual Transportation or utility infrastructure Extensions <br />1 $1000 + $5/ linear ft of each improvement <br />Site Preparation <br />Complete Site Preparation (requires engineer) <br />$1,500 + $50/ acre <br />Small Site Preparation <br />$250 <br />San Marcos River Coridor Site Plan <br />$250 <br />Permit to install on -site sewage disposal system <br />$175 <br />TIA <br />$315 <br />TIA Worksheet <br />$100 <br />Driveway /Sidewalk Permit <br />Residential (Type I Driveway or Sidewalk <br />$25 <br />Commercial (Type II Driveway or Sidewalk <br />$50 <br />ROW Maintenance/ Improvement Permit <br />5% of project value ($50 min / $2000 max) <br />Other Permit Fees <br />On-premise signs <br />$1 /s ft $50 min. <br />Off-premise signs / billboards <br />$250 <br />Fence permit Fee <br />$50 <br />Resubmittal Fee for 3rd Submittal (All Permit Types) <br />$250 ea resubmittal <br />Sidewalk <br />$5sgft <br />SrnartCode Protected Trees <br />$'1501 Call er inch <br />SmartCode Herita e `l°rees <br />00/ Caliper inch <br />* All multipliers should be rounded to the nearest whole number Item 15 <br />