Laserfiche WebLink
<br /> responsibilities on the project, together with a description of the services to be <br /> provided. <br /> (3) Procedures for determining that testing laboratories meet the requirements of the <br /> American Society of Testing and Material's standards on laboratory evaluation, <br /> referenced in the contract specifications (D 3666, C 1077). <br /> (4) Qualifications of engineering supervision and construction inspection personnel. <br /> (5) A listing of all tests required by the contract specifications, including the type and <br /> frequency of tests to be taken, the method of sampling, the applicable test standard, <br /> and the acceptance criteria of tolerances permitted for each type of test. <br /> (6) Procedures for ensuring that the tests are taken in accordance with the program, that <br /> they are documented daily, that the proper corrective actions, where necessary, are <br /> undertaken. <br /> b. Submit at completion of the project, a final test and quality control report documenting <br /> the results of all tests performed, highlighting those tests that failed or did not meet the <br /> applicable test standard. The report shall include the pay reductions applied and reasons <br /> for accepting any out-of-tolerance material. An interim test and quality control report shall <br /> be submitted, if requested by the FAA <br /> FAA Form 5100-37 (10-89) Development or Noise Program Page 4 of 6 Pages <br />