My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-067/Approving a local project w/TxDOT for Hwy. 80 and Loop 82 at IH 35 for aesthetic improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-067/Approving a local project w/TxDOT for Hwy. 80 and Loop 82 at IH 35 for aesthetic improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2013 10:03:34 AM
Creation date
5/14/2013 1:53:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-67
Date
5/7/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CSJ #0016 -09 -037 & 0286 -01 -053 <br />District # 14 - Austin <br />Code Chart 64 #37950 <br />Project: Intersection Improvements <br />On LP 82 and SH 80 at IH 35 <br />Attachment A <br />PAYMENT PROVISION AND WORK RESPONSIBILITIES <br />The Local Government will pay for the additional cost to install powder coated signal poles at the <br />intersections of SH 80 and LP 82 at IH 35 and for the aesthetics to the retaining walls on LP 82. The <br />Local Government's estimated cost of this additional work is $139,206, including construction items, <br />Indirect and Direct State Costs. The State has estimated the project to be as follows: <br />CSJ: 0286 -01 -053 SH 80 <br />Description <br />Total Estimated <br />State Participation <br />Local Participation <br />Cost <br />% <br />Cost <br />% <br />Cost <br />Construction of powder coated <br />$59,55 <br />0% <br />$0 <br />100% <br />$59,550 <br />signal system (By State) <br />Direct State Costs (including <br />$5,955 <br />0% <br />$0 <br />100% <br />$5,955 <br />review, inspection and <br />oversight) <br />10% <br />Indirect State Costs (5.1 %) <br />$3,037 <br />0% <br />$0 <br />100% <br />$3,037 <br />Subtotal: 0286 -01 -053 <br />$68,542 <br />$ <br />$68,542 <br />CSJ: 0016 -09 -037 LP 82 <br />Description <br />Total Estimated <br />State Participation <br />Local Participation <br />% <br />Cost <br />% <br />Cost <br />Cost <br />Construction of powder coated <br />$46,994 <br />0% <br />$0 <br />100% <br />$46,99 <br />signal system (By State) <br />Construction of retaining wall <br />$14,40 <br />0% <br />$0 <br />100% <br />$14,40 <br />esthetics (By State) <br />Construction Items Subtotal: <br />$61,39 <br />$ <br />$61,39 <br />Direct State Costs (including <br />$6,139 <br />0% <br />$0 <br />100% <br />$6,13 <br />review, inspection and <br />oversight) <br />10% <br />Indirect State Costs (5.1 %) <br />$3,131 <br />0% <br />$0 <br />100% <br />$3,131 <br />Subtotal (Construction, direct <br />$70,66 <br />$ <br />$70,66 <br />nd indirect costs): <br />016 -09 -037 <br />OTAL (0286 -01 -053 & 0016- <br />$139,20 <br />$ <br />$139,20 <br />9 -03? <br />Construction Responsibilities <br />A. The State shall advertise for construction bids, issue bid proposals, receive and tabulate the <br />bids, and award and administer the contract for construction of the Project. Administration of <br />the contract includes the responsibility for construction engineering and for issuance of any <br />AFA— LPAFA_VolProj Page 1 of 2 Revised 04/01/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.