My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2013-018/Granting the consent to the creation of LaSalle MUD
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2013
>
Ord 2013-018/Granting the consent to the creation of LaSalle MUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2014 4:44:52 PM
Creation date
5/16/2013 10:30:34 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
Number
2013-18
Date
4/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
provisions of Article XVI, Section 59 of the Constitution of Texas, and Chapters 49 and <br />54 of the Texas Water Code. <br />IV. Ownership of Land to be Included <br />Tile Petitioners hold fee simple title to Property within the proposed Districts, and <br />are the owners of more than fifty percent (50 %) in value of the land therein as shown on <br />the tax rolls of Hays County, Texas. <br />The Petitioners certify and agree that: <br />(l) there are no lien holders on the Property. <br />(2) there are no persons residing on the Property to be included in the Districts. <br />V. Nature of Work to be Done by District <br />The general nature of the work to be done by the Districts at the present time is <br />the acquisition, construction, operation, and maintenance of water, wastewater, roads and <br />drainage systems for domestic, industrial, and commercial purposes, and all other <br />purchase, construction, acquisition, ownership, lease, operation, maintenance, repair, <br />improvement, and extension of such additional improvements, facilities, plants, <br />equipment, and appliances as shall be consonant with the purposes for which the Districts <br />shall be organized, including powers to construct and /or maintain roads. The project, <br />including the proposed improvements, is practicable and feasible, in that water supply is <br />available and the terrain of the territory to be included in the Districts is of such a nawre <br />that a waterworks system, a drainage system, roadway systems and a wastewater system <br />can be constructed at a reasonable cost. In addition, there is a public necessity for the <br />project and the project would be a benefit to the land to be included in the Districts, in <br />that such land will be developed for residential and commercial purposes, thereby <br />fiuthering the public welfare. <br />VI. Estimate of Costs <br />It is now estimated by Petitioners, from such information as is available at this <br />time, that the ultimate cost of the project described in paragraph V will be approximately <br />$90,683,000. <br />VII. Necessity of Work <br />The above - described work is necessary for the development of the Property. The <br />area proposed to be within the Districts is located within the extraterritorial jurisdiction of <br />the City of San Marcos, and is urban in nature. It is within the growing environs of <br />Central Texas, in proxunity to populous and developing sections of Hays County, Texas, <br />and is expected to experience substantial and sustained residential and commercial <br />PETITION FOR CONSENT OF <br />CITY OF SAN MARCOS 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.