My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1992-140
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1992
>
Res 1992-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2007 2:34:48 PM
Creation date
7/12/2007 2:34:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1992-140
Date
11/23/1992
Volume Book
108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- -- -- --='-- ::_- -'..<:,:: ::c.- ~ -:-=:= ,- --- <br /> <br />III 1'-- <br /> <br /> <br /> <br /> <br /> <br />CAST-IN-PLACE CONCRETE <br /> <br />~- <br />The concrete mix designs proposed by the contractor will be )'eviewed <br />and compared with project specifications. Design computations will be <br />checked using typical aggregate properties. The mixes will be hatched <br />in the laboratory and 6 confirmation cylinders/beams will be cast from <br />each mix for compression testing. Test results will be submitted as ; <br />I at'e available. I <br /> <br />Concrete testing will include sampling plastic concrete, measuring I <br />slump and air (if required), recording ambient and mix temperatures, ¡ <br />and casting cy1inders for compressive testing. Test cylinders will be i <br />cast at the rate of one set of 4 cylinders per 50 cubic yards of I <br />concrete placed. Cylinders will then be picked up and tra~sported to <br />our laboratory where they will be cured under standard laboratory II <br />conditions and tested at 7 and 28 days. Strengths that do not meet <br />project specifications will be verbally reported. <br /> <br /> <br />Estimate Quantities I <br /> <br />Enaineering ~ <br />Review of mix design submitted by others, I <br />1 at $75.00 each ...................................... S 75.00 I <br /> <br />: 1.a,Qoratorv. I <br />Batch and confirmation of others mix design, ¡ <br />1 at $125.00 each ..................................... $ 125.00 I <br /> <br />Design confirmation cylinder tests, ! <br />6 at S10.00 each ...................................... $ 60.00 ¡ <br />I <br />Field ¡ <br />Engineering technician to perform fie1d services, I <br />40 hours at $27.00 per hour... ................... ..... $1,080.00 I <br /> <br />Concrete cylinder tests, 45 tests at I <br /> <br />S10.00 eactl ........................................... $ 450.00 <br /> <br /> <br />Tl"ansportation <br />Vehicle charge, 14 trips to the jobsite <br />at $25.00 each ........................................ $ 350.00 <br /> <br /> <br />Estimate for Cast-in-Place Concrete Activities ............... $2,140.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~';:'vTM"'E.'Te;"N ,-""UN"":""'-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.