My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1992-088
San-Marcos
>
City Clerk
>
02 Ordinances
>
1990 s
>
1992
>
Ord 1992-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2007 2:39:43 PM
Creation date
7/12/2007 2:39:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
1992-88
Date
12/7/1992
Volume Book
109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> foBfI <br /> .. <br /> CITY OF SAN MARCOS <br /> . <br /> DISTRIBUTION LINE EXTENSION POLICY <br /> APPENDIX A <br />RESIDENTIAL SERVICE <br />The city will construct an overhead primary line extension to <br />provide service to a residential facility requiring full time <br />service at the regular established rates and minimum monthly charges <br />under the following conditions: <br /> , <br />1. PERMANENT' RESIDENCE - A standard overhead line extension <br /> (single phase) up to 1200 feet will be provided for a <br /> residence occupied on a full time basis and which is <br /> constructed on a permanent foundation. Non-standard <br /> facilities and extensions in excess of 1200 feet may require <br /> the customer to pay the additional cost. (See Rule 5 below) <br />2. MULTIPLE DWELLING - A standard overhead line extension will <br /> be extended for service to multiple dwellipgs on" the same <br /> basis as for a Permanent Residence, with consideration being <br /> given for the number of dwelling units and the expected <br /> occupancy ratio. Three phase electric service may also be <br /> extended where deemed desirable by the city, with the <br /> stipulation that a maximum of 400 feet of three phase line <br /> shall be the equivalent of 1200 feet of single phase for the <br /> purposes of determining the length of extension. <br />3. MOBILE HOME - Electric service will be provided to a <br /> customer-owned meter pole from the City's existing primary <br /> lines. In situations wherE? the extension of prJ.mary <br /> facilities is required to serve a mobile home, the applicant <br /> will be required to pay the estimated cost in advance for <br /> constructing the extension. <br />4. MOBILE HOME PARKS AND MOBILE HOME SUBDIVISIONS - Mobile homes <br /> to be located inside City-designated Mobile Home Parks and <br /> Mobile Home Subdivision will be provided service in <br /> accordance with Appendix G. <br />5. SEASONAL FACILITIES - A permanent electric service will be <br /> provided from the city's existing primary lines. Where <br /> extension of primary facilities is required to serve weekend <br /> or resort homes, cabins and other domestic facilities which <br /> are not utilized on a full time basis, the applicant will be <br /> required to bear the actual cost for constructing the entire <br /> extension. <br /> -58- <br />
The URL can be used to link to this page
Your browser does not support the video tag.