My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1991-003
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1991
>
Res 1991-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2007 4:09:52 PM
Creation date
7/12/2007 4:09:52 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1991-3
Date
1/14/1991
Volume Book
101
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Volatile Or~anic 8240 EPA SW-846 <br /> Compounds (PPL) <br /> <br /> Semi-Volatile Organic 8270 EPA SW-846 <br /> Compounds (PPL) <br /> <br /> Reportin~ <br /> <br /> Following each monitoring event, the laboratory analytical reports and QA/QC data will be <br /> reviewed. A letter describing any QA problems or unusual parameter concentrations will be <br /> transmitted to the City along with the following documentation: <br /> 1) forms containing information on ground-water sample collection procedures <br /> and field measurements; <br /> 2) completed chain-of-custody forms; <br /> 3) laboratory reports of ground-water analyses and QA/QC results; and <br /> 4) TDH Groundwater Monitoring Report forms with the analytical data, field <br /> data and heading information. <br /> Other Related Work <br /> The City has' requested that we measure monitoring well water levels and the pond level <br /> following the recent heavy rains. The TDH also has requested that sampling be conducted <br /> after the next heavy rain (1 inch in 24 hours). Accordingly, MFG staff will measure water <br /> levels on November 9, 1990 (the day after the rainfall event) and early the following week <br /> (several days after the rainfall event). These measurements will provide indications of <br /> recharge, particularly as it relates to monitoring wells MW-lOl and MW-I06, which have been <br /> dry since completion. The sampling event will b~ scheduled in coordination with TDH <br /> personnel, who plan to collect split samples. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.