Laserfiche WebLink
<br /> 4.0 COST ESTIMATE <br /> The estimated budget for this project is $ 25,684. It is based on the assumption 'that only four <br /> of the six monitoring wells will contain sufficient water for sampling each quarter (a total of 16 <br /> samples for laboratory analysis) and that the analytical suite will be expanded to include semi- <br /> volatile organics, as required by the TDH in their 10/22/90 letter to the City. As per our <br /> conversation on 11/5/90, the budget also includes the laboratory charges for the two ground- <br /> water samples analyzed in addition to the six samples quoted in our February 1990 work plan <br /> and cost estimate. Other costs included are for the meeting with the City and Corp of <br /> Engineers on August 28, 1990 and two water level monitoring events in November 1990. <br /> Details of the estimate are presented by task on the next page. Actual charges will be made <br /> on a time and materials basis according to the attached 1990 Schedule of Charges. We will <br /> not exceed the estimated budget without the prior notification and approval of the City of San <br /> Marcos. If a lesser effort is required, the invoiced amount will be less than the estimated <br /> budget. <br /> 7 <br />