Res 2013-093/Approving an Interlocal Agreement between Guadalupe Blanco River Authority (GBRA) local participation for Phase II of a US Army Corps of Engineers
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-093/Approving an Interlocal Agreement between Guadalupe Blanco River Authority (GBRA) local participation for Phase II of a US Army Corps of Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 10:00:19 AM
Creation date
6/27/2013 2:30:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-93
Date
6/18/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1. MANAGEMENT COMMITTEE; ADMINISTRATION OF STUDY. <br />A. Local Participant understands that it shall designate, within sixty (60) days <br />after the execution of this Agreement, one representative who shall work <br />with GBRA to provide oversight for the preparation of the Project <br />parameters, to serve on the "Project Management Committee" (Committee). <br />The Committee will approve the study schedule, scope and work products as <br />shown in Attachment A, beginning approximately September 1, 2013 and <br />completing all tasks by December 31, 2014, with final report due to the <br />TWDB by December 31, 2014. The study schedule, scope, and work <br />products recommended by the Committee must be unanimous and shall be <br />implemented by GBRA through its contract with the USACE, to the extent <br />that funding for the Project is available. <br />B. GBRA shall serve as the lead sponsor for the purpose of this Agreement in <br />which capacity it shall perform all administrative duties associated with <br />Project including, but not limited to, entering into contract(s) with <br />consultants(s) and contract administration necessary for the Project. GBRA <br />shall thereafter provide a copy of the Notice to Proceed to Local Participant. <br />Section 2. FISCAL PROVISIONS. The total cost of Phase II of the Project is <br />$1,590,950. GBRA anticipates 50% federal funding of $795,475 from the <br />USACE and a grant from the Texas Water Development Board of $397,737.50 <br />that will pay 25% of the cost of the Project. Federal funding has been budgeted <br />through FY 2014 and the Phase II grant was awarded by the Texas Water <br />Development Board at their regularly scheduled meeting on April 18, 2013. Any <br />data, studies or information existing prior to that time shall be considered existing <br />information and cannot be counted as payment or in -kind services. Local <br />Participant has no responsibilities or financial obligations for Phase I of the <br />Project. GBRA expended $22,985 to prepare the TWDB grant application for <br />Phase II of the Project and will fund $5,000 of that expense. Local Participant <br />will pay $1,383.50 in addition to the 25% local cost share to cover its share of the <br />grant application preparation expense. The local share of costs will be allocated <br />among the participating communities, as shown here: <br />