My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-089/Approving an agreement between Alan Plummer Associates for professional engineering services in connection with a Water Master Plan Update
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-089/Approving an agreement between Alan Plummer Associates for professional engineering services in connection with a Water Master Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 9:59:40 AM
Creation date
6/27/2013 3:49:38 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-89
Date
6/18/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />This Agreement is effective t» n p i x , 7 o l -i between the City of <br />San Marcos, Texas, a home -rule municipal corporation, (the "City"), 630 East Hopkins, San <br />Marcos, Texas 78666 and Alan Plummer Associates, Inc. (the "Engineer"), 6300 La Calma <br />Drive, Suite 400, Austin Texas 78752, for the Engineer's provision of professional consulting <br />services in connection with the City of San Marcos Water Master Plan Update (the "Project). <br />The City and the Engineer agree as follows: <br />ARTICLE 1 <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment <br />A, Scope of Services, which is incorporated herein by reference for all intents and purposes, and <br />which services may be more generally described as follows: Gathering and analyzing <br />information to update a computer model of the City's distribution system and identify <br />recommended improvements to meet current requirements and future demands. The Information <br />will be presented in an Update to the Water Master Plan. <br />B. The Engineer understands that time is of the essence and agrees to provide all design <br />work and professional services in the most expedient and efficient manner possible in order to <br />complete the Project by: Three Hundred Sixty -Five calendar days in accordance with the <br />approved Project schedule included in this Agreement as Attachment B. <br />C. The Engineer will not subcontract any work under this Agreement without prior written <br />approval fiom the City. In the event approval is given by the City, the Engineer will specify the <br />appropriate insurance requirements and miscellaneous provisions by separate written agreement <br />with the subcontractor. <br />D. The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />E. Stephen J. Coonan, P.E. is the Engineer's Project Representative assigned to this Project. <br />The Engineer will not substitute another representative for this Project unless approved in <br />writing by the City in advance of such proposed substitution. In the event the City and the <br />Engineer cannot agree to the substitution of the Project Representative, the City may terminate <br />this agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.