My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1991-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1991
>
Res 1991-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2007 10:01:18 AM
Creation date
7/19/2007 10:01:18 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1991-80
Date
6/24/1991
Volume Book
103
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> expeditiously as possible. <br /> 2.8 The CITY shall pay all costs incident to obtaining bids or <br /> proposals from contractors (i.e.: legal notice requirements and the <br /> provision of City facilities for pre-bid conferences). <br /> 2.9 The CITY shall either direct the ARCHITECT to perform any <br /> Additional Services necessary to complete the Project or shall furnish <br /> such services itself. <br /> 2.10 The CITY shall pay all fees for filing and processing permits <br /> in connection with the Project. <br /> 2.11 The CITY shall bear all costs incident to this Article. <br /> 2.12 The CITY shall provide its standard construction contract <br /> documents which do not include plans or technical specifications, to <br /> the ARCHITECT prior to commencement of the design phase, Section 1.2. <br /> 2.13 CITY shall furnish all necessary field surveys and <br /> geotechnical investigations which are required to collect design data. <br /> Field surveys for construction purposes generally include the layout of <br /> structures, pipelines, roadways, quantity and measurement <br /> determinations, and surveys required to establish location of land <br /> boundaries and corners. The ARCHITECT shall establish the scope of <br /> these surveys as set forth in Article 1, paragraph 1.5. <br /> 2.14 In the event that the CITY requires resident inspection <br /> services to be performed on the Project, the City shall provide <br /> building space suitable for use as an office, the storage of records, <br /> drawings, files, samples, contractor submittals and other work related <br /> material until thirty (30) days following completion of the project. <br /> The space shall be air conditioned and shall be in proximity to the <br /> Project location. <br /> AR'.rICLE 3 <br /> COKS'l"RUC'l'IOR COS'.r <br /> 3.1 DEFIKI'.rIOR <br /> 3.1.1 The Construction Cost shall be the total cost or estimated <br /> cost to the CITY of all elements and phases of the Project designed or <br /> specified by the ARCHITECT. <br /> 3.1.2 The Construction Cost shall include at current market rates, <br /> including a reasonable allowance for overhead and profit, the cost of <br /> any equipment which has been designed, specified, selected or specially <br /> -l4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.