Laserfiche WebLink
DATE: 2012 -11 -05 <br />ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK <br />BY THE <br />UNION PACIFIC RAILROAD <br />THIS ESTIMATE GOOD FOR 6 VONTHS EXPIRATION DATE IS :2013 -05 -06 <br />DESCRIPTION OF WORK: <br />INSTALL NEW EXIT GATES & EGMS SYSTEM IN NEW CABIN WITH NEW REN.OTE <br />LOCATION AND REMOVE INSIDE GATES AT SAN MARCOS, TX. PATTON ST. <br />M.P. 210.15 ON THE AUSTIN SUB. DOT $4476850 <br />WORK TO BE PERFORMED BY RAILROAD WITH EXPENSE AS BELOW: <br />SIGNAL - CITY OF SAN MARCOS - 100$ <br />ESTIMATED USING FEDERAL ADDITIVES WITH INDIRECT AND <br />OVERHEAD CONSTRUCTION COST'S - 176.51$ <br />PID: 75608 A;%): 11627 MP,SUBDIV: 210.15, AUSTIN <br />SERVICE UNIT: 12 CITY: KROGER STATE: TX <br />DESCRIPTION <br />QTY UNIT LABOR <br />MATERIAL <br />RECOL.L UPRR <br />TOTAL <br />ENGINEERING WORK <br />ENGINEERING <br />8600 <br />8600 <br />8600 <br />LABOR ADDITIVE 176.51k <br />23620 <br />23620 <br />23620 <br />SIG -HWY XNG <br />4821 <br />4821 <br />4821 <br />- TOTAL ENGINEERING <br />- - ----- <br />37041 <br />-------- <br />-------- -- - ----- <br />37041 <br />-- ---- -- <br />37041 <br />SIGNAL WORK <br />ASPHALT <br />5000 <br />5000 <br />5000 <br />BILL PREP <br />900 <br />900 <br />900 <br />CONTINGENCIES <br />123346 <br />123346 <br />123346 <br />CONTRACT <br />12177 <br />12177 <br />12177 <br />EGNS SYSTEM <br />60656 <br />60656 <br />60656 <br />LABOR ADDITIVE 176.51% <br />123950 <br />123950 <br />123950 <br />MATL STORE EXPENSE <br />30 <br />38 <br />38 <br />PERSONAL EXPENSES <br />33750 <br />33750 <br />33750 <br />ROCK /GRAVEL /FILL <br />3000 <br />3000 <br />3000 <br />SAW CUT <br />5000 <br />5000 <br />5000 <br />SIGNAL <br />69323 <br />121778 <br />191101 <br />191101 <br />TRANSP /IB /05/RCLW CONTR <br />20770 <br />20770 <br />20770 <br />TOTAL SIGNAL <br />- - - - - -- <br />194173. <br />-- - ----- <br />385515 <br />- -- ----- -------- <br />579GBB <br />-- -- - - -- <br />579688 <br />TRACK & SURFACE WORK <br />ENVIRONMENTAL - PERMITS <br />1 <br />1 <br />1 <br />TOTAL TRACK & SURFACE <br />1 <br />1 <br />1 <br />LABOR /MATERIAL EXPENSE 231214 385516 -- - - - - -- -- - - - - -- <br />RECOLLECTIBLE /UPRR EXPENSE 616730 0 -- - - - - -- <br />ESTIMATED PROJECT COST 616730 <br />THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF <br />AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, <br />UPRR WILL BILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. <br />