My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2013-095/Approving a Public Highway At-Grade Crossing Improvement Agreement with Union Pacific Railroad Company for Installation of a Quad Gate System at the Patton Street Crossing
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2013
>
Res 2013-095/Approving a Public Highway At-Grade Crossing Improvement Agreement with Union Pacific Railroad Company for Installation of a Quad Gate System at the Patton Street Crossing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2014 10:00:44 AM
Creation date
6/28/2013 3:47:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2013-95
Date
6/18/2013
Volume Book
198
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
" AREMA UNIT STATEMENT OF RAILROAD HIGHWAY GRADE CROSSING SIGNALS <br />ESTIMATED MAINTENANCE COSTS <br />OUILDIlNG AMMICAP <br />e <br />STREET <br />TOWN <br />MILEPOST <br />SUBDIVISION <br />AARIDOT NO. <br />WORK ORDER# <br />DESCRIPTION <br />FOR PEI) #75608 <br />BY THE UNION PACIFIC RAILROAD <br />PATTON <br />SAN MARCOS, TX. <br />21015 <br />AUSTIN <br />447685U <br />11627 <br />UNIT VALUE QUANTITY <br />NON -CODED TRIC CIRCUIT, (Slandalone AFPAC orRinc 10) <br />SUPERIMPOSED CIRCUIT(AFrAc) I DETECTION LOOP <br />HIGHWAY GRADE CROSSING SIGNAL <br />(ONE PAIR OF FLASHING LIGHTS) <br />ADDITIONAL PAIR OF LIGHTS <br />GATE MECHANISM, AUTOMATIC <br />WITH ARM UP TO 26 IT <br />GATE MECHANISM, AUTOMATIC <br />WITH ARM OVER 26 FT <br />GCP/HXP (Constant warning device, per track circuit) <br />EXIT GATE MANAGEMENT SYSTEM RACK* <br />MOVEMENT DETECTOR (PMD) <br />MOVEMENT DETECTOR (STANDBY UNIT) <br />RADIO DATA LINK, PER UNIT <br />PREEMPTION CIRCUIT <br />DATA RECORDER <br />REMOTE MONITORING DEVICE* <br />BONDED RAIL JOINTS (per milt, each nil, slacic bonded) <br />BATTERY AND CHARGER (per set) <br />TOTAL UNIT COUNT <br />PAVEMENT RESTORATION COSTS <br />*UP supplied Unit Value <br />September 14, 2012 <br />lC 1� <br />2 <br />0 <br />0 <br />2 <br />0 <br />0 <br />2 <br />3 <br />C► <br />1 <br />2 <br />2 <br />8 <br />2 <br />16 <br />10 <br />0 <br />0 <br />15 <br />3 <br />45 <br />10 <br />1 <br />10 <br />6 <br />0 <br />0 <br />3 <br />0 <br />0 <br />1 <br />0 <br />0 <br />2 <br />0 <br />0 <br />1 <br />0 <br />0 <br />2 <br />1 <br />2 <br />1 <br />0 <br />0 <br />1 <br />3 <br />3 <br />Annual Alshilauntce Cost at S170Nnit <br />84 <br />(Actual) <br />$14,280 <br />
The URL can be used to link to this page
Your browser does not support the video tag.