Laserfiche WebLink
Public Highway At -Grade Crossing 06/01/10 <br />Standard Form Approved, AVP -Law <br />BUILDING AMERICA° <br />D. All construction work of the City shall be performed diligently and completed within a reasonable time. No part of the <br />Project shall be suspended, discontinued or unduly delayed without the Railroad's written consent, and subject to such <br />reasonable conditions as the Railroad may specify. It is understood that the Railroad's tracks at and in the vicinity of the work <br />will be in constant or frequent use during progress of the work and that movement or stoppage of trains, engines or cars may <br />cause delays in the work of the City. The City hereby assumes the risk of any such delays and agrees that no claims for <br />damages on account of any delay shall be made against the Railroad by the State and /or the Contractor. <br />SECTION 3. INJURY AND DAMAGE TO PROPERTY <br />If the City, in the performance of any work contemplated by this Agreement or by the failure to do or perform anything <br />for which the City is responsible under the provisions of this Agreement, shall injure, damage or destroy any property of the <br />Railroad or of any other person lawfully occupying or using the property of the Railroad, such property shall be replaced or <br />repaired by the City at the City's own expense, or by the Railroad at the expense of the City, and to the satisfaction of the <br />Railroad's Assistant Vice President Engineering- Design. <br />SECTION 4. RAILROAD MAY USE CONTRACTORS TO PERFORM WORK <br />The Railroad may contract for the performance of any of its work by other than the Railroad forces. The Railroad <br />shall notify the City of the contract price within ninety (90) days after it is awarded. Unless the Railroad's work is to be <br />performed on a fixed price basis, the City shall reimburse the Railroad for the amount of the contract. <br />SECTION 5. MAINTENANCE AND REPAIRS <br />A. The City shall, at its own sole expense, maintain, repair, and renew, or cause to be maintained, repaired and renewed, <br />the entire Crossing Area and Roadway, except the portions between the track tie ends, which shall be maintained by and at the <br />expense of the Railroad. <br />B. If, in the future, the City elects to have the surfacing material between the track tie ends, or between tracks if there is <br />more than one railroad track across the Crossing Area, replaced with paving or some surfacing material other than timer <br />planking, the Railroad, at the City's expense, shall install such replacement surfacing, and in the future, to the extent repair or <br />replacement of the surfacing is necessitated by repair or rehabilitation of the Railroad's tracks through the Crossing Area, the <br />City shall bear the expense of such repairs or replacement. <br />SECTION 6. CHANGES IN GRADE <br />If at any time the Railroad shall elect, or be required by competent authority to, raise or lower the grade of all or any <br />portion of the track(s) located within the Crossing Area, the City shall, at its own expense, conform the Roadway to conform <br />with the change of grade of the trackage. <br />SECTION 7. REARRANGEMENT OF WARNING DEVICES <br />If the change or rearrangement of any warning device installed hereunder is necessitated for public or Railroad <br />convenience or on account of improvements for either the Railroad, highway or both, the parties will apportion the expense <br />incidental thereto between themselves by negotiation, agreement or by the order of a competent authority before the change <br />or rearrangement is undertaken. <br />SECTION 8. SAFETY MEASURES; PROTECTION <br />OF RAILROAD COMPANY OPERATIONS <br />It is understood and recognized that safety and continuity of the Railroad's operations and communications are of the <br />utmost importance; and in order that the same may be adequately safeguarded, protected and assured, and in order that <br />accidents may be prevented and avoided, it is agreed with respect to all of said work of the City that the work will be <br />performed in a safe manner and in conformity with the following standards: <br />A. Definitions. All references in this Agreement to the City shall also include the Contractor and their respective <br />officers, agents and employees, and others acting under its or their authority; and all references in this Agreement to work of <br />the City shall include work both within and outside of the Railroad's property. <br />Public Highway At -Grade Crossing 06/01/10 Page 2 of 5 Exhibit D <br />Standard Form Approved, AVP -Law General Terms and Conditions <br />