Laserfiche WebLink
EXHIBIT B, COST ESTIMATE <br />Schedule of Values Hays County CR 266 <br />Joe Bland Construction <br />13111 Dessau Road <br />Austin, TX 78754 <br />Contact: Dave Burrough <br />Phone: 512 - 821 -2808 <br />Fax: <br />note To: Jennifer Shell, P.E. Job Name: Hays Co. CR 266 <br />City Engineer Date of Plans: January 7,2013 <br />City of San Marcos CoSM Dated May 17, 2013 <br />Phone: Revision Date: Relocation City of San Marcos Water <br />Fax: Utilities on CR 266 <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />AMOUNT <br />City of San Marcos Water Relocation <br />CR 266 <br />20" CASING CROSSING THE PROP ROADWAY <br />COSM CASING <br />61.00 <br />LF <br />205.00 <br />12,505.00 <br />2" HDPE RELOC COMMISSIONER'S SERV <br />THRU SM CASING <br />260.00 <br />LF <br />48.00 <br />12,480.00 <br />CONNECTIONS EXISTING LINE AND NEW <br />METERS <br />4.00 <br />EA <br />50.00 <br />200.00 <br />ENCASE EXISTING RECLAIMED WATER <br />LINES <br />40.00 <br />LF <br />60.00 <br />2,400.00 <br />NEW 2" WATER LINE STA. 142 -115 <br />2,700.00 <br />LF <br />6.00 <br />16,200.00 <br />NEW 12" CARRIER PIPE IN 20" CASING <br />213.00 <br />LF <br />175.00 <br />37,275.00 <br />TIE INTO EXISTING 12" & 6" LINES <br />2.00 <br />EA <br />2,433.50 <br />4,867.00 <br />REMOVE EXISTING VALVES (SALVAGED TO <br />BE PICK UP SM <br />4.00 <br />EA <br />250.00 <br />1,000.00 <br />Total City of San Marcos Utility Relocation <br />$86,927.00 <br />plus $3,025 for additional traffic control <br />10% contingency = $,8,995 <br />New Total - $98,947 <br />