Laserfiche WebLink
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />This Agreement is effective July 2, 2013 between the City of San Marcos, Texas, a <br />home -rule municipal corporation, (the "City "), 630 East Hopkins, San Marcos, Texas 78666 and <br />Halff Associates, Inc (the "Engineer "), Two Sierra Way, Suite 105, Georgetown, Texas 78626, <br />for the Engineer's provision of design and construction phase services in connection with the <br />Airport 12 -inch Water Main Project (the "Project "). <br />The City and the Engineer agree as follows: <br />ARTICLE I <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment <br />A, Scope of Services, which is incorporated herein by reference for all intents and purposes, and <br />which services may be more generally described as follows: Design and construction phase <br />services for a proposed 12 -inch water line through the San Marcos Airport from SH 21 to the <br />Gary Job Corps facility. <br />B. The Engineer understands that time is of the essence and agrees to provide all design <br />work and professional services in the most expedient and efficient manner possible in order to <br />complete the design by December 13, 2013 in accordance with the approved Project schedule <br />included in this Agreement as Attachment C. <br />C. The Engineer will not subcontract any work under this Agreement without prior written <br />approval from the City. In the event approval is given by the City, the Engineer will specify the <br />appropriate insurance requirements and miscellaneous provisions by separate written agreement <br />with the subcontractor. <br />D. The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />E. Todd Jackson, P.E., is the Engineer's Project Representative assigned to this Project. The <br />Engineer will not substitute another representative for this Project unless approved in writing by <br />the City in advance of such proposed substitution. In the event the City and the Engineer cannot <br />agree to the substitution of the Project Representative, the City may terminate this agreement. <br />F. The City will designate and notify the Engineer of its designation of an authorized Project <br />representative who will act on the City's behalf with respect to this Agreement. <br />