My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1991-131
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1991
>
Res 1991-131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2007 10:03:07 AM
Creation date
7/20/2007 10:03:07 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
1991-131
Date
10/28/1991
Volume Book
104
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> address provided by San Marcos for the payment amount determined <br /> pursuant to Paragraphs "F" and" G", below. <br /> F. Monthlv Payments. Beginning on the date that a <br /> <br /> certificatioh of completion is delivered in writing by San Marcos <br /> to GBRA stating that the water treatment plant to be constructed <br /> is capable of delivering treated water, or on January 1, 1995, <br /> whichever first occurs, S an Marcos shall pay GBRA at its office <br /> in Guadalupe County, Texas, or such other place as GBRA may <br /> designate in writing, not later than the twentieth (20th) day of <br /> each month, pursuant to the monthly bill rendered to San Marcos <br /> as provided in Paragraph E, above, a dollar amount equal to one- <br /> twelfth of the annual cost resulting from multiplying the Annual <br /> Commitment in acre-feet times the rate to be paid by San Marcos <br /> for stored water reserved and supplied pursuant to this Contract <br /> (the "stored water rate"). The present stored water rate is <br /> $44.76 per acre foot. <br /> In addition, San Marcos shall pay a rate for water delivery, <br /> if any, established by GBRA, on a cost of service basis, for the <br /> construction and operation of any facilities, including but not <br /> limited to a pump station, pipeline and terminal s":orage <br /> facilities, necessary to deliver stored water from the Guadalupe <br /> River to the water treatment plant site selected by San. Marcos. <br /> The final plans for delivery facilities shall be reviewed and <br /> approved by San Marcos prior to construction and payment by San <br /> Marcos shall begin with the initial delivery of water to the <br /> plant site. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.