Laserfiche WebLink
<br /> delivery system, including, without limitation, all damages and <br /> governmental or judicial assessments; interest and other related <br /> fixed charges not included in khe above clause of this Paragraph; <br /> general and administrative expenses reasonably attributable to <br /> the delivery system; wages, salaries, and other compensation and <br /> fringe benefits payable to GBRA's employees, and professional <br /> fees, including, without limitation, legal, accounting, <br /> financial, engineering, consulting, and other technical fees, <br /> which may be allocated to work performed in connection with the <br /> delivery system; expenses ~ncurred in protecting the water supply <br /> delivered to San Marcos, including, without limitation, Water <br /> Master fees; and all other costs (whether of a capital or expense <br /> nature) incurred on account of, or in connection with, the <br /> ownership, occupancy, maintenance, operation, replacement, repair <br /> or restoration of the delivery system that are not included in <br /> the above clauses of this Paragraph. <br /> In the event of a disagreement between GBRA and San Marcos <br /> over the stored water rate or the delivery rate, GBRA and San <br /> Marcos may apply by appropriate means to the Texas vlater <br /> Commission, or any agency succeeding to the rate-making <br /> jurisdiction of the Texas Water Commission, to establish a just <br /> and reasonable rate for such water. <br /> I. Metering Equipment. At the onset of initial use of <br /> <br /> water under this Contract, GBRA shall furnish, install, operate <br /> and maintain or cause to be furnished, installed, operated and <br /> maintained at the Point of Delivery the necessary metering <br /> equipment and required devices of standard type for properly <br /> 7 <br />