My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-001
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2007 11:46:58 AM
Creation date
7/20/2007 11:46:58 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-1
Date
1/8/1990
Volume Book
97
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Statement <br /> <br />lists <br /> <br />required <br /> <br />of Bidder's Qualifications, financial statements of bidders, <br /> <br />of <br /> <br />bidder's <br /> <br />other documents <br /> <br />proposed <br /> <br />subcontractor <br /> <br />and <br /> <br />all <br /> <br />to <br /> <br />be <br /> <br />a <br /> <br />submitted <br /> <br />with <br /> <br />the <br /> <br />bids, <br /> <br />and <br /> <br />shall <br /> <br />make <br /> <br />recommendation <br /> <br />to Owner regarding award of bid as related to the River <br /> <br />Crossing portion of the construction contract. <br /> <br />1.3.2 <br /> <br />respond <br /> <br />Engineer <br /> <br />shall <br /> <br />attend <br /> <br />pre-construction <br /> <br />conference and <br /> <br />a <br /> <br />to <br /> <br />all <br /> <br />questions of the Contractor and Owner relative to the <br /> <br />River Crossing. <br /> <br />1.3.3 <br /> <br />Contract <br /> <br />The <br /> <br />Construction <br /> <br />Phase will commence with the award of the <br /> <br />for <br /> <br />Construction <br /> <br />will <br /> <br />and <br /> <br />terminate <br /> <br />when <br /> <br />the Project is <br /> <br />1.3.4 <br /> <br />accepted by the Owner. <br /> <br />in <br /> <br />the <br /> <br />Unless otherwise provided in this Agreement and incorporated <br /> <br />construction <br /> <br />contract <br /> <br />documents, <br /> <br />the Engineer shall provide <br /> <br />and <br /> <br />administration <br /> <br />in <br /> <br />Owner. <br /> <br />Engineer's <br /> <br />provided <br /> <br />and <br /> <br />of <br /> <br />the <br /> <br />Contract <br /> <br />for Construction as set forth herein <br /> <br />the <br /> <br />construction <br /> <br />contract <br /> <br />documents <br /> <br />approved <br /> <br />by <br /> <br />administration <br /> <br />of <br /> <br />the <br /> <br />contract for construction shall be <br /> <br />in <br /> <br />strict adherence with the construction contract documents <br /> <br />jeopardize <br /> <br />Engineer <br /> <br />course <br /> <br />construction <br /> <br />shall <br /> <br />not <br /> <br />of <br /> <br />conduct <br /> <br />which <br /> <br />pursue <br /> <br />might <br /> <br />a <br /> <br />any of Owner's right thereunder. <br /> <br />Minor deviations from the <br /> <br />contract <br /> <br />documents <br /> <br />that <br /> <br />do <br /> <br />not affect the validity of <br /> <br />1. 3.5 <br /> <br />performance bond(s) are permitted. <br /> <br />Relative <br /> <br />to the River Crossing portion of the East Side <br /> <br />Interceptor <br /> <br />agent <br /> <br />consult <br /> <br />writing. <br /> <br />only <br /> <br />Project, the Engineer shall be a representative but not an <br /> <br />of the Owner during the Construction Phase, and shall advise and <br /> <br />with <br /> <br />the <br /> <br />Owner <br /> <br />and <br /> <br />provide <br /> <br />advice, <br /> <br />if <br /> <br />any, <br /> <br />to Owner in <br /> <br />Owner's <br /> <br />instructions to the Contractor regarding the River <br /> <br />Crossing shall be forwarded through the Engineer, unl-ess (1) Engineer <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.