My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-045
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 11:49:06 AM
Creation date
7/23/2007 11:49:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-45
Date
4/23/1990
Volume Book
97
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> CHANGE Owner () <br /> ORDER Engineer ~~ <br /> Contractor ( ) <br /> CHARLES WILLIS & ASSOCIATES, INC. Field ( ) <br /> ARCHITECTS. ENGINEERS. PLANNERS Other ( ) <br /> AVIATION CONSULTANTS <br /> PROJECT San Marcos Municipal Airport CHANGE ORDER NUMBER: 2 <br /> (name, address) San Marcos, Texas 78666 <br /> A.I.P. Project No. 3-48-0195-07-90 DATE: July 24 ~ 1991 <br /> TO ENGINEER: Charl es Will is & Associates ~ Tnc. ENGINEER PROJECT NO: 010-12 <br /> (name, address) 709-B W. Abram St. CONTRACT DATE: <br /> Arlington~ Texas 76013 April 24 ~ 1990 <br /> CONTRACT FOR: Des i gn and General <br /> Construction Administration of <br /> The Contract is changed as follows: Airport Project <br /> 1. Deduct engineering fee established by Change Order No.1 (Revised) from <br /> $3~500.00 to $1~500.00. The original fee was established because we determined <br /> that we would have to develop plans and specifications for the Runway 12-30. <br /> medium intensity runway 1 ighting rehabil Hation. Plans and specifications <br /> ultimately were not required therefore we are reducing the fees to be limited <br /> to pre-application, applicatfon~ evaluation of required work and general <br /> construction administration of the subsequent construction. <br /> NET DECREASE OF CHANGE ORDER NO.2:............. .... ........ .... .....$2~OOO.00 <br /> Not valid untllalgned by the Owner, Engineer and Contractor. <br /> The original (Contract Sum)(Q'úØ~täèij(~~rJdé) was..........................................$ 133~~99.00 <br /> Net change by previously authorized Change Orders.........................................................$ 3~ 00.00 <br /> The (Contract SUm)~~ -- ~H9Þ)f prior to this Change Order was...........$ 137~499.00 <br /> The (Contract Sum)(~W W~ ~~ will be (i~ì6ð)(decreased) <br /> (j(~~~ by this Change Order in the amount of.......................................................$ 2~OOO.00 <br /> The New (Contract Sum)(~~)'"füjj(diò6JP'Sø) including this Change order <br /> will be................................................................................................................................$ 135~499.00 <br /> The Contract Time will be ~~Q'cij(unchanged) by (N/ A ) days <br /> The date of Substantial Completion as of the date of this Change Order therefore is N/A <br /> NOTE: Thill sunwnary does not reflect changes in the Contract Sum, Contrad time or Gulllllllleed Maximum Price which have been authorized by Construction Change Direc:tÎV8 <br /> Charìes Wiììis & Associates, Inc. City of San Marcos <br /> ENGINEER OWNER <br /> 709-8 W. Abram Street 630 E. Hopkins <br /> Address Address <br /> Arlington, Texas 76013 San Marcos~ Texas 78666 <br /> ß~- /J) I b. <14 <br /> . 1f1/~ <br /> BY ¿ .1) - ~- <br /> Charles A. Willis \:) <br /> Date Dat9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.