Laserfiche WebLink
2013 Preferred Rate Schedule 13P <br />The following professional and support service rates have been established for RPS <br />Espey in calendar year 2013. <br />Classification <br />Rates <br />Principal Engineer <br />$ <br />195.00 <br />- $ <br />225.00 <br />Sr. Project Manager <br />$ <br />160.00 <br />- $ <br />195.00 <br />Project Manager <br />$ <br />115.00 <br />- $ <br />165.00 <br />Engineer /Scientist/Planner <br />$ <br />95.00 <br />- $ <br />135.00 <br />Engineering Staff <br />$ <br />75.00 <br />- $ <br />115.00 <br />Sr. Technician /Drafter <br />$ <br />85.00 <br />- $ <br />110.00 <br />Technician /Drafter <br />$ <br />55.00 <br />- $ <br />85.00 <br />Administrative Support <br />$ <br />50.00 <br />- $ <br />70.00 <br />Travel and Subsistence: <br />All travel and subsistence expenses will be invoiced at actual cost plus ten (10) percent. <br />Cost of mileage for private and company vehicles is computed at the prevailing rate <br />designated by the U.S. Internal Revenue Service. The current rate is $0.565 per mile. <br />Purchased Services: <br />All purchased services are invoiced at actual cost plus ten (10) percent. These include <br />but are not limited to reproduction, rented or leased equipment, etc. <br />Subconsultant Services: <br />All subconsultant services (geotechnical, survey, landscape architecture, etc.) are <br />invoiced at cost plus ten (10) percent. <br />RPS Page 1 of 1 13P <br />