Laserfiche WebLink
<br /> Plan o~ Operations Page 4 o'f 4 <br /> Reimbursement requests will be supported by paid invoices or other <br /> documentation satis~actory to the 5C5 Government Representative. <br /> Quality Assurance tests may be performed by the 5CS although none <br /> are anticipated prior to the start oT work under this agreement. <br /> Costs associated with such tests may be o~fset against costs claimed <br /> by the City. <br /> E. City Work Force Personnel: <br /> Bob Ed Cochran Supervisor $22.29 <br /> Steve Stautzenberger Crew Leader '$15.31 <br /> Ernest Sanchez Operator II $13.02 <br /> Juan Esquivel Operator II $12.89 <br /> Robert Torres Operator II $11 .95 <br /> John Ybarra Operator II $11.81 <br /> Labor Costs per Hour includes Bene~its at 48.9% plus Overhead at 7 % <br /> Benefits Include: Worker's Comp; Medical and Dental Insurance; <br /> Stability Pay; Vacation, sick leave and holidays <br /> Overhead Includes: Fuel cost 'for pick-ups; Office supplies; <br /> Tires; Pickup Repair; Uní'forms; Travel 8. Training <br /> F. Schedule o~ Operations: <br /> Attachment A to the Plan o'f Operations lists the Construction <br /> Sequence that will be followed Tor the items o~ work to be per'formed <br /> under this agreement. The work wi 11 be completed within 477 <br /> calendar days a~ter the e'f'fective date of the agreement. (date <br /> executed by SCS) <br /> G. Construction Drawings: <br /> The City will provide the 5C5 a copy o'f the Construction Drawings <br /> with the field changes or alterations made to the project items that <br /> will be used as "as-built" drawings by the City and SC5. <br /> Annotations of 'field changes or alterations will be kept current and <br /> the annotated drawings will be available 'for review by authorized <br /> City and SCS personnel as work progresses. <br /> H. Attachments to the Agreement and Plan o~ Operations: <br /> 1. Attachment A, Construction Sequence <br /> 2. Technical Spec i fïcat ions, numbered pages 83 thru 232 <br /> 3. Construction Drawing TX-EN-O237, Sheets 1 thru 27 <br />