My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1990-111
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1990
>
Res 1990-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:23:50 PM
Creation date
7/30/2007 4:23:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1990-111
Date
9/24/1990
Volume Book
100
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 86 <br /> RAMON, LUCIO, RIO VISTA, RIO VISTA ANNEX, AND BICENTENNIAL <br /> PARKS RECREATION DEVELOPMENT <br /> TECHNICAL SPECIFICATIONS IB <br /> SITE PREPARATION <br /> (5) Bicentennial Park - Construction of the pedestrian <br /> bridge, hike and bike trail, and picnic tables with BBQ grills and <br /> garbage containers. <br /> d. The Inspector's (Engineer's) trailer and Contractor's <br /> temporary office shall be located in the Ramon Lucio Park, where <br /> shown on Sheet 3 of the drawings. The Contractor shall be <br /> responsible for connecting and providing electrical power and <br /> telephone service to the Inspector's trailer (trailer provided by <br /> others) and for all service fees (except long distance phone calls) <br /> associated with the electrical and telephone service. The <br /> electrical service shall be 110-120 volt, 60 amp. alternating <br /> current. Long distance calls will be the responsibility of the <br /> Owner. <br /> lB-03 LAYOUT: <br /> a. The Contractor shall perfo~ all interim surveys (layout) <br /> required to insure that the work is executed to the neat lines, <br /> grades, and elevations shown on the drawings and specifications or <br /> as established or indicated by the Engineer. The specification <br /> covers all interim surveys (layout) for work required by the <br /> contract items at the time of award. If additional interim survey <br /> costs are incurred during the performance of the contract as a <br /> result of changed or added items of work for which the Contractor <br /> is entitled to an adjustment in contract price, compensation for <br /> such costs will be included in the price adjustment for the items <br /> of work changed or added. <br /> b. Equipment for interim surveys (layout) shall be of <br /> sufficient quality and condition to provide the accuracy required. <br /> Equipment shall be in good condition and in proper adjustment at <br /> all times. <br /> Materials shall include all stakes, spikes, steel pins, batter <br /> boards, tools and other accessories as may be required to <br /> accomplish, from the bench marks shown sheet 3 of the drawings, the <br /> layout herein specified. <br /> lB-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.