Laserfiche WebLink
<br /> DATE: October 5, 1990 Item No.3 <br /> PROJECT: Asphalt Over1ay Approximately 1,200' of Existing <br /> Aircraft Parking Apron (Area 3) <br /> San Marcos Municipal Airport <br /> San Marcos, Texas <br /> PREPARED BY: Michael Lynn Moore. P.E. <br /> Item <br /> No. Description Quantity Unit Cost Amount <br /> 1 2" Bituminous Overlay Course 7,334 TON $34.00 $249,356 <br /> 2 Bituminous Prime Coat 23,334 GAL 1.25 29.168 <br /> 3 Tie Down Anchors 459 EACH 80.00 36,720 <br /> 4 Taxiway and Apron Markings 5.997 S.F. 0.55 3,298 <br /> SUBTOTAL $318,542 <br /> Contingencies 31.854 <br /> TOTAL CONSTRUCTION COST $350.396 <br /> Engineering 23.444 <br /> Design Testing 1,000 <br /> Surveying 2,900 <br /> Construction Testing 4,100 <br /> Construction Inspection 17,160 <br /> TOTAL ESTIMATE $399,000 <br />