Laserfiche WebLink
<br /> Exhibit II -1 <br /> Water: <br /> 16" Line 11,000 ft. @ $25/ft. $ 275,000 <br /> River Crossing 125,000 <br /> Fire Protection (Pump/storage) 150,000 <br /> Bore IH-35 50,000 <br /> $ 600,000 <br /> Contingency 10% 60,000 <br /> Engineering 10% 60,000 <br /> <br /> TOTAL $ 720,000 <br /> Wastewater: <br /> 12" Line (Gravity Flow) 9,000 ft. @ $40/ft. $ 360,000 <br /> 8" Line (Force Main) 5,300 ft. @ $10/ft. 53,000 <br /> Lift station 150,000 <br /> River Crossing 50,000 <br /> $ 613,000 <br /> contingency 10% 61,300 <br /> Engineering 10% 61,300 <br /> <br /> TOTAL $ 735,600 <br /> Total Water $720,000 <br /> Total Wastewater $735,600 <br /> GRAND TOTAL $1.455.600 <br />