Laserfiche WebLink
<br />Category Cost <br />---------------------------------------------------------------- <br />IREATMENI TANKê. <br />< 2,000 Gallons 270/Month <br />2,500 Gallons 405/Month <br />25,000 Gallons 2,025/Month <br />ACTIVATED CARBON SYSTEMS <br />----- ----- <br />5 Gallons per Minute 675/Month <br />20 Gallons per Minute 2.025/Month <br />100 Gallons per Minute 5,400/Month <br />< 20.000 Lbs. Activated Carbon 2. OO/Lb. <br />> 20,000 Lbs. Activated Carbon 1. 50/Lb. <br />COMPRESSED AIR SYSTEMS <br />-- ----- <br />15 CFM Compressor 675/Month 202/Wk 68/Day <br />100 CFM Compressor l,O12/Month 338/Wk 101/Day <br />300 CFM Compressor 2,025/Month 608/Wk 202/Day <br />Road Base 170/Load <br />Particle Board 135/Lot <br />Bolt Cutters 199/Lot <br />Dry Ice 1. 35/L b <br />55 Gallon Drums 49/Ea <br />Sample Containers 1. 35/Ea <br />BTEX Testing <48Hr) 169/Ea <br />Total Hydrocarbons Testing <48Hr) 169/Ea <br />Lead Testing <48Hr) 95/Ea <br />E.P. Toxicity Testing <48Hr) 338/Ea <br />Waste H2O Disposal 202/Drum <br />Old Fuel Disposal 135/Drum <br />Tank Disposal ~ < 1000G 338/Ea <br />Tank Disposal ~ > 6500G 506/Ea <br />Sludge Disposal 520/Drum <br />Additional goods and services are to be provided on a time and <br />material basis not to exceed 20% percent over contractor cost. <br />Additional goods or services shall not be provided unless <br />authorized or confirmed in writing by the Owner. <br />Contractor reserves the right to increase Owner's unit cost <br />commensurate with the percentage increase in contractor's unit <br />cost. <br /> 8 <br />