Laserfiche WebLink
<br /> City of San Marcos <br /> Texas Capital Fund Application <br /> Cost Estimate <br /> COST ESTIMATE FOR WATER EXTENSION <br /> 16" Line 11,000 ft. @ $25 per foot $275,000 <br /> River Crossing 125,000 <br /> Fire Protection (Pump/Storage) 150,000 <br /> Bore Interstate Highway 35 50.000 <br /> $600,000 <br /> Contingency 10% 60,000 <br /> Engineering 10% 60.000 <br /> <br /> TOTAL $720.000 <br /> <br /> Amount Requested through TCDP Grant $500,000 <br /> Project Cost Balance - City Portion $220,000 <br />