My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1989-041
San-Marcos
>
City Clerk
>
03 Resolutions
>
1980 s
>
1989
>
Res 1989-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2007 3:42:18 PM
Creation date
8/2/2007 3:42:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
1989-41
Date
5/8/1989
Volume Book
94
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Prod uct Operations <br /> Restructured - past and are vital in producing <br /> fISCal year, Product Rohr components. <br /> Operations is responsible <br /> for the design, manufacturing, Rohr-Hagerstown <br /> quality assurance and timely The company acquired a 422,000- <br /> delivery of Rohr products. square-foot composite materials <br /> The organization integrates bonding facility in Hagerstown, <br /> product engineering, which Md., from Fairchild Industries <br /> designs and develops Rohr's in October 1987. The five auto- <br /> core products (nacelles, thrust claves at Rohr-Hagerstown <br /> reversers and pylons), and all increased the company's auto- <br /> manufacturing functions to clave capacity by almost 50 <br /> assure improved product flow percent. Rohr also gained a <br /> from concept to delivery. proven work force and manage- <br /> For the past five quarters, ment team with extensive prior <br /> the company's manufacturing experience with similar products. Assemblers Barbara Zubaty <br /> units have made deliveries (foreground) and Dave Roney <br /> Ivhich have resulted in con- New Arkansas Facilities 'Work on composite material <br /> nacelle components for a <br /> secutive quarterly record sales. During the year, Rohr began General Electric CF6-80C2 <br /> Th support projected sales production at and made deliveries engine at Rohr-Riverside. <br /> and accelerating customer from two new 142,500-square- <br /> delivery schedules into the foot final assembly facilities <br /> next decade, the company, in located in Heber Springs and programs, will now also be directly <br /> the past year, added nearly Sheridan, Ark. Activity at these involved in product assembly <br /> 1 million square feet (more than for commercial programs. <br /> a 20 percent increase) of pro- operations will increase as <br /> duction facilities. delivery schedules demand. Rohr France <br /> Of particular significance is Rohr- Foley In addition to completing a <br /> more than a 90 percent increase 17,OOO-square-foot expansion to <br /> in Rohr's autoclave capacity. The company completed a provide more manufacturing <br /> Autoclaves are large, pres- 180, OOO-square-foot expansion area, Rohr purchased 10 acres <br /> surized "ovens" to cure the at its Foley, Ala. operation. Rohr- of land, with an option for an <br /> bonding adhesives in metallic Foley, which previously carried additional nine acres, adjacent <br /> and composite manufacturing out final assembly on military to the Airbus Industrie facility <br /> in Toulouse, France. Additional <br /> facilities at Rohr France, now a <br /> Assembler Harold Gibson 'installs the nose cowl on a nacelle certificated repair station, will <br /> system for a Pratt & Whitney JT9D-7R4 engine at Rohr's Au~rn, support increasing Airbus <br /> Wash. facility. Bohr-Auburn then delivers the full propulsion <br /> system to Boeìngfor installation on a 747-200 airliner. Industrie deliveries and serve as <br /> a spares distribution center. <br /> <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.