Laserfiche WebLink
<br /> EXHIBIT B PAGE 3 <br />Page Three <br />Service Plan <br />Wastewater: <br />12" Line (Gravity Flow) 9,000 ft. <br /> @ $40jft. $ 360,000 <br />8" Line (Force Main) 5,300 ft. <br /> @ $10jft. 53,000 <br />Lift Station 150,000 <br />River Crossing 50,000 <br /> $ 613,000 <br /> Contingency 10% 61,300 <br /> Engineering 10% 61, 300 <br /> TOTAL $ 735,000 <br />Total Water $720,000 <br />Total Wastewater $735,600 <br />GRAND TOTAL $1.455.600 <br /> <br />Time Table for Infrastructure: <br />Engineering: Completion by July 31, 1989 <br />Construction: Begin August 1, 1989 <br /> Completion by December 31, 1989 <br />