Laserfiche WebLink
<br /> SECTION B - FACILITY OPERATION CHARACTERISTICS <br /> B.1 Number of employee shifts worked per 24-hour day is . <br /> Average number of employees per shift is . <br /> B.2 Starting times of each shift: 1st am 2nd am 3rd am <br /> - - - <br /> pm pm pm <br /> Note: The following information in this section must be <br /> completed for each product line. <br /> 8.3 Principal product produced: <br /> B.4 Raw materials and process additives used: <br /> <br /> B.5 Production process is: <br /> [] Batch [] Continuous [1 Both % batch % continuous <br /> Average number of batches per 24-hour day <br /> B.6 Hours of operation: a.m. to p.m. [1 continuous <br /> B.7 Is production subject to seasonal variation? [] Yes [] No <br /> If yes, briefly describe seasonal producation cycle. <br /> <br /> B.8 Are any process changes or expansions planned during the next <br /> three years'? [] Yes [1 No <br /> If yes, attach a separate sheet to this form describing the <br /> nature of planned changes or expansions. <br /> B.9 Provide a brief description of existing and proposed s~~pling <br /> ports. <br /> -9- <br />