My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-115/approving the third Change in Service to the agreement with American StructurePoint, Inc. relating to the Sessom Drainage Improvements Project to add engineering design services for additional Storm Drain, Water and Wastewater Pipeline Impro
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-115/approving the third Change in Service to the agreement with American StructurePoint, Inc. relating to the Sessom Drainage Improvements Project to add engineering design services for additional Storm Drain, Water and Wastewater Pipeline Impro
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:15:23 PM
Creation date
7/2/2019 4:01:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Change in Service
Number
2019-115
Date
6/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2019-115R <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br />MARCOS, TEXAS APPROVING THE THIRD CHANGE IN SERVICE TO <br />THE AGREEMENT WITH AMERICAN STRUCTUREPOINT, INC. <br />RELATING TO THE SESSOM DRAINAGE IMPROVEMENTS PROJECT <br />BY INCREASING THE AMOUNT OF THE AGREEMENT BY $146,418.62 <br />TO ADD ENGINEERING DESIGN SERVICES FOR ADDITIONAL <br />STORM, DRAIN, WATER AND WASTEWATER PIPELINE <br />IMPROVEMENTS; AUTHORIZING THE CITY MANAGER OR HIS <br />DESIGNEE TO EXECUTE THE APPROPRIATE DOCUMENTS TO <br />IMPLEMENT THE CHANGE IN SERVICE; AND DECLARING AN <br />EFFECTIVE DATE. <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br />TEXAS: <br />PART 1. A change in service (Authorization for Change in Service No. 3) to the <br />agreement with American StructurePoint, Inc. relating to the Sessom Drainage Improvement <br />Project by increasing the amount of the agreement by $146,418.62 to add engineering design <br />services for additional storm, drain, water and wastewater pipeline improvements is hereby <br />approved. <br />PART 2. The City Manager or his designee is authorized to execute the appropriate <br />documents to implement the change in service. <br />PART 3. This resolution will be in full force and effect immediately from and after its <br />passage. <br />ADOPTED on June 18, 2019. <br />ane Hughson <br />Mayor <br />Attest: <br />Jamie Le Case <br />Ci <br />
The URL can be used to link to this page
Your browser does not support the video tag.