My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-131 authorizing a Local On-System Agreement (“LOSA”) with the Texas Department of Transportation, relating to the Briarwood and River Ridge Drainage Improvement Project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-131 authorizing a Local On-System Agreement (“LOSA”) with the Texas Department of Transportation, relating to the Briarwood and River Ridge Drainage Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 10:36:06 PM
Creation date
8/22/2024 10:35:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-131
Date
8/5/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2024-131R <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br /> MARCOS, TEXAS AUTHORIZING A LOCAL ON-SYSTEM <br /> AGREEMENT ("LOSA") WITH THE TEXAS DEPARTMENT OF <br /> TRANSPORTATION, RELATING TO THE BRIARWOOD AND RIVER <br /> RIDGE DRAINAGE IMPROVEMENT PROJECT, TO PROVIDE FOR <br /> NECESSARY CONSTRUCTION OF A DETENTION POND OUTFALL <br /> ALONG THE IH-35 FRONTAGE ROAD, IN THE AMOUNT OF <br /> $584,065.00; AUTHORIZING THE CITY MANAGER, OR HER <br /> DESIGNEE, TO EXECUTE THE APPROPRIATE DOCUMENTS TO <br /> IMPLEMENT THE LOSA ON BEHALF OF THE CITY;AND DECLARING <br /> AN EFFECTIVE DATE. <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN <br /> MARCOS,TEXAS: <br /> PART 1. The project description and location for the local on system agreement with <br /> the Texas Department of Transportation (TxDOT) is to construct a reinforced concrete pipe <br /> and box culvert detention pond outfall across the southbound IH-35 frontage road between <br /> Briarwood Court and River Ridge Parkway. <br /> PART 2. The estimated construction cost is $584,065 and is funded by the Texas <br /> Water Development Board. The City is responsible for 100%of cost overruns. <br /> PART 3. The City of San Marcos will not build this outfall until TxDOT's plan <br /> approval has been obtained. <br /> PART 4. The City of San Marcos Engineering and Capital Improvement Department, <br /> and consultants will ensure the detention pond outfall are constructed in strict accordance with <br /> the approved plans. <br /> PART 5. The City Manager, or her designee, is authorized to execute appropriate <br /> documents to implement the TxDOT Local On-System Agreement on behalf of the City. <br /> PART 6. This resolution shall be in full force and effect immediately from and after <br /> its passage. <br /> ADOPTED on August 5,2024. <br /> Jane Hughson <br /> Mayor <br /> Attest: <br /> Elizabeth Trevino <br /> City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.