Laserfiche WebLink
RESOLUTION NO. 2025-115R <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br /> MARCOS, TEXAS APPROVING A CHANGE IN SERVICE TO THE <br /> CONTRACT WITH QUIDDITY ENGINEERING, LLC, FOR THE <br /> UNIVERSITY DRIVE WATER LINE REPLACEMENT PROJECT, TO <br /> INCLUDE BID PHASE SERVICES,CONSTRUCTION PHASE SERVICES, <br /> AND ARCHAEOLOGICAL MONITORING AS REQUIRED BY THE <br /> TEXAS HISTORICAL COMMISSION IN AN AMOUNT NOT TO EXCEED <br /> $53,083.00; AUTHORIZING THE CITY MANAGER, OR HER DESIGNEE, <br /> TO EXECUTE THE APPROPRIATE DOCUMENTS TO IMPLEMENT <br /> THE CHANGE IN SERVICE; AND DECLARING AN EFFECTIVE DATE. <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br /> TEXAS: <br /> PART 1. A Change in Service to amend the contract with Quiddity Engineering, LLC <br /> (PSA 224-265),to include archaeological monitoring during construction as required by the Texas <br /> Historical Commission (THC), bidding and construction phase services, and record drawings, in <br /> an amount not to exceed$53,083.00, for a total contract price of$148,858.00, is approved. <br /> PART 2. The City Manager, or her designee, is authorized to execute the appropriate <br /> documents to implement the change in service on behalf of the City. <br /> PART 3. This resolution will be in full force and effect immediately from and after its <br /> passage. <br /> ADOPTED on July 1, 2025. <br /> /JL6 ks <br /> Jane Hughson <br /> Mayor <br /> Attest: <br /> Elizabeth Trevino <br /> City Clerk <br />