My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-054 awarding a contract to Liberty Civil Construction, LLC, for the Highway 80 Utility Project, to connect the proposed lift station, force main, and reclaimed transmission main to pipelines.
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-054 awarding a contract to Liberty Civil Construction, LLC, for the Highway 80 Utility Project, to connect the proposed lift station, force main, and reclaimed transmission main to pipelines.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 8:38:28 PM
Creation date
4/13/2026 8:38:26 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-054
Date
4/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2026-54R <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br /> MARCOS, TEXAS AWARDING A CONTRACT TO LIBERTY CIVIL <br /> CONSTRUCTION, LLC, FOR THE HIGHWAY 80 UTILITY PROJECT, <br /> TO CONNECT THE PROPOSED LIFT STATION, FORCE MAIN, AND <br /> RECLAIMED TRANSMISSION MAIN TO PIPELINES PREVIOUSLY <br /> CONSTRUCTED WITH THE BLANCO RIVERINE FLOOD <br /> MITIGATION PROJECT, IN THE AMOUNT OF $13,550,404.24; <br /> AUTHORIZING THE CITY MANAGER, OR HER DESIGNEE, TO <br /> EXECUTE THE CONTRACT ON BEHALF OF THE CITY; AND <br /> DECLARING AN EFFECTIVE DATE. <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br /> TEXAS: <br /> PART 1. A contract with Liberty Civil Construction, LLC, for the Highway 80 Utility <br /> Project, in the amount of$13,550,404.24, is hereby approved. <br /> PART 2. The City Manager, or her designee, is authorized to execute appropriate <br /> documents related to this contract on behalf of the city. <br /> PART 3. This resolution will be in full force and effect immediately from and after its <br /> passage. <br /> ADOPTED on April 7, 2026. <br /> ane Hughson <br /> Mayor <br /> Attest: <br /> Elizabeth Trevino <br /> City Clerk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.